Contractor · Electrical
ALL BAY SOLAR
44 building permits since 2016 in Marin County, CA; San Bruno city, CA and Los Altos Hills town, CA, across 6 counties — $758,400 in reported job value over 33 permits that state one.
- Building permits
- 44
- Reported job value
- $758.4K
- Active
- 2016–2026
- Latest permit
- Mar 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marin County, CA26
- San Bruno city, CA6
- Los Altos Hills town, CA4
- Mountain View city, CA2
- Santa Rosa city, CA2
- Campbell city, CA1
- Citrus Heights city, CA1
- Santa Cruz city, CA1
- Saratoga city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 5 |
| 2017 | 3 |
| 2018 | 3 |
| 2019 | 3 |
| 2020 | 8 |
| 2021 | 2 |
| 2022 | 5 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 5 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar24
- Electrical13
- Battery storage9
- Roofing8
- EV chargers2
- Generators1
- Electric meters1
Permit types
As the building departments classify them.
- RESIDENTIAL26
- Electrical5
- RES_ALTERATION3
- ELECTRICAL2
- RES SOLAR2
- BL, EL, CH1
- EL1
- RES_REROOF1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 27, 2026 | Electrical | Ev charging staton & msp | Campbell City | — |
| Jan 26, 2026 | Electrical | Main panel upgrade 200a | Santa Rosa City | — |
| Jan 16, 2026 | Electrical | Installing (14) 440w roof mounted modules, (1) tesla pw3, (1) main panel upgrade 200a. Revised 1.27.26 remove main panel from project - to be completed under b2 | Santa Rosa City | — |
| Jan 13, 2026 | Electrical | Install level 2 evse indoors. | Saratoga City | — |
| Sep 3, 2025 | RESIDENTIAL | INSTALL A ROOF-MOUNTED PV SYSTEM &ENERGY STORAGE SYSTEM: · (32) HYUNDAI HIN-T440NF(BK) MODULES· (32) ENPHASE IQ8A-72-2-US (240V) MICROINVERTERS· (01) TESLA POWE | Marin County | $50,000 |
| May 15, 2025 | RESIDENTIAL | 21.16 kw (46)460 watt Modules (2) batteries Franklin aPower 30kwh (1) Batteries Sub Panel (1) AC Combiner Box | Marin County | $90,000 |
| Apr 11, 2025 | RESIDENTIAL | Install (1) Powerwall 3 Battery Install (1) EPO Emergency Power Off Switch Install (19) 460W Solar Modules Roof Mounted (7.74Kw Total) | Marin County | $35,500 |
| Feb 20, 2025 | Roofing | WUI, HISTORICAL REROOF SHINGLE TO COMP | Santa Cruz City | $18,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated32
- Finaled10
- Expired1
- Completed1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- ALL BAY SOLAR CONSTRUCTION INC
- ALLBAY SOLAR
- ALL BAY SOLAR CONSTRUCTION
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.