Contractor · Specialty (solar, fire, telecom)
8M SOLAR, LLC
483 building permits since 2018 in Greensboro city, NC; Raleigh city, NC and Johnston County, NC, across 18 counties — $13,709,652 in reported job value over 270 permits that state one.
- Building permits
- 483
- Reported job value
- $13.7M
- Active
- 2018–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greensboro city, NC136
- Raleigh city, NC104
- Johnston County, NC63
- Harnett County, NC55
- Cary town, NC26
- Brunswick County, NC24
- Gaston County, NC13
- Brassfield township, NC11
- Buncombe County, NC8
- New Hanover County, NC5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 29 |
| 2020 | 42 |
| 2021 | 39 |
| 2022 | 70 |
| 2023 | 25 |
| 2024 | 42 |
| 2025 | 87 |
| 2026 (YTD) | 66 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar425
- Electrical186
- Battery storage86
- Remodels14
- Roofing14
- EV chargers10
- Additions9
Permit types
As the building departments classify them.
- Building104
- Electrical100
- SOLAR PANELS62
- ELECTRICAL RESIDENTIAL54
- Residential54
- BD-Solar Panels Roof-Mount14
- Residential - Solar Panels12
- ELECTRICAL9
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Residential - Solar Panels | Solar Installation of 15.640 KW Residential Roof-Mounted PV System and One Tesla Power Wall Battery Backup at 5722 Kildare Ct Belmont NC 28012. | Gaston County | $38,632 |
| Oct 19, 2026 | Residential - Solar Panels | Solar Installation of 16.560 KW Residential Roof-Mounted PV System and One Tesla Power Wall Battery Backup at 2317 Lexington St Belmont NC 28012. We will have a | Gaston County | $40,904 |
| Oct 16, 2026 | SOLAR PANELS | SOLAR PANELS | Johnston County | $59,084 |
| Oct 16, 2026 | SOLAR PANELS | SOLAR PANELS | Johnston County | $32,605 |
| Sep 30, 2026 | Residential | Residential Roof Top Solar Installation. | Greensboro City | $37,900 |
| Sep 24, 2026 | ELECTRICAL RESIDENTIAL | Resi Roof Mounted Solar Panels | Harnett County | — |
| Sep 17, 2026 | Residential | Solar Installation of 11.50 KW Resi Roof-Mount PV System and 1 TPW3 Battery Backup. (Service Side Work: Power Drop Required) | Greensboro City | $33,900 |
| Sep 17, 2026 | SOLAR PANELS | SOLAR PANELS | Johnston County | $33,925 |
Permit status
Where its permits stand, as the departments report them.
- Finaled180
- Completed136
- C/o issued77
- Issued35
- Active30
- Expired16
- Not stated2
- Approved2
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- 8MSOLAR LLC
- 8MSOLAR
- 8M SOLAR
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.