Contractor · Plumbing
Faron Young
45 building permits since 2020 in Methuen city, MA; North Andover town, MA and Haverhill city, MA, across 5 counties — $153,947 in reported job value over 34 permits that state one.
- Building permits
- 45
- Reported job value
- $153.9K
- Active
- 2020–2026
- Latest permit
- Sep 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Methuen city, MA8
- North Andover town, MA5
- Haverhill city, MA4
- Arlington town, MA4
- Boston city, MA4
- Newburyport city, MA3
- Acton town, MA3
- Everett city, MA3
- Needham town, MA3
- Peabody city, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 7 |
| 2022 | 2 |
| 2023 | 9 |
| 2024 | 12 |
| 2025 | 11 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing35
- Gas15
- Bathrooms15
- Kitchens9
- Remodels5
- Water heaters4
- HVAC3
- Generators3
- Additions1
- Demolition1
Permit types
As the building departments classify them.
- Plumbing Permit17
- Gas Fitting Permit4
- *Plumbing Permit4
- PLUMBING3
- Plumbing Permit Application3
- Gas Fitter Permit2
- Gas Fitting Permit - Residential & Commercial Projects2
- Gas Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 2, 2026 | Plumbing Permit | Cast iron pipe rotted out, cutting out that section and replacing with new. | Peabody City | $2,000 |
| Apr 30, 2026 | Gas Permit | Gas company came and pull the meter because both Unit 1 & 2 were piped togther on house side. Have to separate each gas main so they are on their own meter. | Everett City | $3,000 |
| Apr 30, 2026 | Plumbing Permit | First floor bathroom-toilet/sink; first floor breakroom- sink, filtered water faucet, garbage disposal and icemaker line; second floor bathroom-toilet/sink; sec | Methuen Town City | $33,500 |
| Dec 16, 2025 | *Plumbing Permit | Installation of 3/4 bathroom including: double bowl lavatory, toilet and shower | North Andover Town | — |
| Dec 9, 2025 | Gas Permit | Gas piping a hot air furnace icluding the flu and fresh air intake. Basement/Mechanical room | Acton Town | $1,500 |
| Nov 26, 2025 | Plumbing Permit | Addition of a commercial kitchen, including: 3 bay sink, 2 hand wash sink and a vegetable wash sink and a grease trap and a floor drain | Danvers Town | $18,000 |
| Sep 24, 2025 | Plumbing Permit | Remodel two bathrooms on second floor | Acton Town | $9,000 |
| Aug 17, 2025 | Plumbing Permit Application | Installation of a new water heater | Arlington Town | $3,500 |
Permit status
Where its permits stand, as the departments report them.
- Completed24
- Active14
- Closed4
- Issued2
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.