45 building permits since 2004 in Elk Grove city, CA; Sacramento city, CA and Davis city, CA, across 5 counties — $3,679,690 in reported job value over 45 permits that state one.
- Building permits
- 45
- Reported job value
- $3.7M
- Active
- 2004–2026
- Latest permit
- Apr 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Elk Grove city, CA22
- Sacramento city, CA8
- Davis city, CA7
- Sacramento County, CA3
- Marin County, CA2
- Tuolumne County, CA1
- Citrus Heights city, CA1
- Mountain View city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2004 | 3 |
| 2005 | 9 |
| 2006 | 3 |
| 2010 | 1 |
| 2014 | 1 |
| 2016 | 2 |
| 2017 | 5 |
| 2019 | 2 |
| 2020 | 2 |
| 2022 | 3 |
| 2023 | 3 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical33
- Electric meters3
- Solar2
- Generators2
- HVAC1
- Battery storage1
- Remodels1
- Roofing1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- ELECTRICAL20
- ELECTRIC COMMERCIAL7
- MISC3
- Hotel or Motel2
- Industrial2
- Apts 5+1
- COMMERCIAL1
- EL, CH1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 28, 2026 | Industrial | EPC - Replace 2000A 480v 3 phase switchboard in existing commercial warehouse, like for like. | Sacramento | $105,500 |
| Oct 23, 2025 | MISC | We will me running wire in conduit from the main meter and breaker to create new power outlets. The power outlets will be 120v, 240v, and 3 phase 250v. | Sacramento County | $2,000 |
| Mar 28, 2025 | MISC | Restore power to parking lot light pedestal. There is no issue with the pedestal or any vandalism to the cabinet itself. | Sacramento County | $2,500 |
| Feb 21, 2025 | — | Solar Ground-Mount | Tuolumne County | $1,500,000 |
| Oct 24, 2023 | Other Struct (non-bldg) | EPC - Install Temporary Power. Provide and install one meter panel, three 100 amp subpanels, four transformers, twelve power poles with OH conductors for tempor | Sacramento | $7,500 |
| Jul 18, 2023 | MISC | Demo existing damaged wires within 2 meter stacks. Provide 2 meter main cabinets to be installed adjacent to existing enclosures. Provide new cables to meter an | Sacramento County | $60,000 |
| Mar 23, 2023 | Apts 5+ | EPC - 2-WAY Communications Call Boxes at Elevator Lobbies | Sacramento | $30,000 |
| Aug 19, 2022 | RESIDENTIAL | Stand-By Generator | Marin County | $56,650 |
Permit status
Where its permits stand, as the departments report them.
- Closed18
- Issued10
- Completed8
- Not stated4
- Finaled3
- Expired2
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- CAPITOL VALLEY ELECTRIC INC
- CAPITOL VALLEY ELECTRIC LLC
- CAPITOL VALLEY ELEC
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.