Contractor · Electrical

HOMELINK SOLAR

46 building permits since 2024 in Lancaster city, CA; Santa Clarita city, CA and Riverside County, CA, across 5 counties.

Building permits
46
Reported job value
—
Active
2024–2026
Latest permit
Aug 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Lancaster city, CA17
  • Santa Clarita city, CA5
  • Riverside County, CA4
  • Los Angeles city, CA4
  • Oceanside city, CA4
  • Vista city, CA4
  • San Bernardino County, CA3
  • Camarillo city, CA2
  • Chino city, CA2
  • Eastvale city, CA1

Permits by year

By issue date (application date where there is none).

02550
43
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
20252
2026 (YTD)43

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical37
  • Solar30
  • Battery storage17
  • EV chargers6
  • Roofing1
  • Generators1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical36
  • Building Misc - Photovoltaic System (PV)3
  • SFD SOLAR APP PLUS WITH ESS3
  • RESIDENTIAL ROOFTOP SOLAR SYSTEM2
  • Building Misc - Electric Meter Upgrade1
  • ENERGY STORAGE SYSTEM - SIMPLE1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 18, 2026Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE SYSTEMVista City—
Aug 17, 2026Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEMVista City—
Apr 30, 2026SFD SOLAR APP PLUS WITH ESSMEP UPGRADE AND ROOFTOP SOLAR 7.04 KW DC and battery.Oceanside City—
Apr 8, 2026Building Misc - Electric Meter UpgradeENERGY STORAGE SYSTEMVista City—
Mar 25, 2026ElectricalInstall (n) battery storage system for (e) photovoltaic system & (n) nema 14-50 (240v) ev outlet inside garage at sfdSanta Clarita City—
Mar 24, 2026ElectricalEv chargerSan Bernardino County—
Mar 24, 2026SFD SOLAR APP PLUS WITH ESSRoof mounted solar with battery. 5.28 kW DC (11.5 kW AC)Oceanside City—
Mar 24, 2026SFD SOLAR APP PLUS WITH ESS7.04 kW DC (11.5 kW AC) ROOF MOUNT PV WITH BATTERYOceanside City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled33
  • Active11
  • Issued1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.