46 building permits since 2021 in Bay County, FL — $317,829 in reported job value over 43 permits that state one.

Building permits
46
Reported job value
$317.8K
Active
2021–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bay County, FL46

Permits by year

By issue date (application date where there is none).

01530
29
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20211
20221
20231
20248
20256
2026 (YTD)29

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical24
  • Plumbing19
  • HVAC12
  • Gas10
  • Electric meters10
  • Grading & excavation8
  • Generators7
  • Heat pumps5
  • Battery storage4
  • Kitchens4

Permit types

As the building departments classify them.

  • Electrical14
  • Plumbing13
  • Mechanical8
  • Generator6
  • Renovation3
  • Gas2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026GeneratorFurnish and install a Generac 26kw standby generator with automatic transfer switch. Includes generator mounting pad, battery, electrical wiring, gas piping conBay County$22,290
Oct 22, 2026PlumbingMain Sewer Line Excavation and Replacement Locate and expose the existing main sewer line. Remove damaged piping. Excavate affected areas safely and in accordanBay County$4,531
Oct 1, 2026Plumbing* Replace approximately 85 feet of the existing sewer line with new Schedule 40 PVC sewer piping. * Run the new sewer line underneath the mobile home and connecBay County$7,118
Sep 21, 2026Generator* Furnish and install one (1) new 26KW Generac standby generator. * Furnish and install a Generac composite generator pad. * Furnish and install a new generatorBay County$17,685
Sep 17, 2026Generator* Provide and install one (1) new 24kW Generac GGN standby generator to provide reliable backup power during utility outages. * Install a new Generac generator Bay County$13,155
Sep 10, 2026PlumbingIncludes excavator and operator. Includes excavating up to 80ft of the right side of the home. Includes cutting and removing sewer line running up to city conneBay County$8,128
Sep 10, 2026Plumbing* Excavate and expose approximately 60 feet of the existing main sewer line from the residence toward the city sewer tap. * Utilize an excavator as necessary toBay County$5,600
Aug 31, 2026PlumbingScope of Work • Remove and dispose old water heater • Install a new Navien NPE-210A tankless water heater. • Securely mount the new unit per manufacturer specifBay County$6,868

Permit status

Where its permits stand, as the departments report them.

  • Closed31
  • Issued4
  • Expired4
  • Abandoned3
  • Finaled2
  • Withdrawn1
  • Reviews in progress1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.