Contractor · Electrical

Gregori Zilli

46 building permits since 2025 in Boston city, MA; Arlington town, MA and North Andover town, MA, across 5 counties — $458,201 in reported job value over 38 permits that state one.

Building permits
46
Reported job value
$458.2K
Active
2025–2026
Latest permit
Oct 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA7
  • Arlington town, MA6
  • North Andover town, MA5
  • Peabody city, MA5
  • Reading town, MA5
  • Beverly city, MA3
  • Danvers town, MA3
  • Haverhill city, MA3
  • Marblehead town, MA2
  • Amesbury city, MA1

Permits by year

By issue date (application date where there is none).

012.525
23
20252026*
* 2026 is year to date.
View as table
YearPermits
202523
2026 (YTD)23

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical42
  • Remodels8
  • Kitchens5
  • Bathrooms5
  • Electric meters3
  • HVAC2
  • Additions2
  • Heat pumps1
  • Demolition1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical Permit18
  • Electrical Permit Application11
  • *Electrical Permit5
  • INTREN4
  • ELECTRICAL3
  • Electrical Permit - RESIDENTIAL ONLY2
  • ELECT.1
  • Electrical Permit - COMMERCIAL ONLY1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 15, 2026Electrical Permit2 sub panelsReading Town$5,500
Oct 14, 2026Electrical PermitRemove/hang, and safe all exterior electrical fixtures, outlets , and the meter box for the new siding to be installed. Rehang, reinstall all electrical , replaMarblehead Town$53,000
Oct 1, 2026ELECTRICALELECTRICALBoston City$4,500
Oct 1, 2026Electrical PermitSome electrical is relocating and some will be installed over the new sidding, the layout of the building is changing a little and they are addinfd some decks oDanvers Town$1
Sep 10, 2026Electrical PermitRewire a attic space into a bedroom and small ofc.Amesbury City$1,500
Sep 8, 2026INTRENINTRENBoston City$9,800
Sep 1, 2026Electrical Permit - RESIDENTIAL ONLYUpgrading the existing service from 100amps to 200 amps, same meter location.Haverhill City—
Aug 28, 2026Electrical Permit ApplicationNoArlington Town$6,000

Permit status

Where its permits stand, as the departments report them.

  • Completed25
  • Active14
  • Closed6
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.