Contractor · Electrical

Christopher David McDonald

46 building permits since 2021 in Orleans Parish, LA.

Building permits
46
Reported job value
—
Active
2021–2026
Latest permit
Sep 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA46

Permits by year

By issue date (application date where there is none).

0510
10
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
202110
20226
202310
20247
20258
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical37
  • Electric meters15
  • Bathrooms8
  • Kitchens5
  • Pools & hot tubs4
  • Additions3
  • HVAC2
  • Remodels2
  • Plumbing1
  • Generators1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 2, 2026—Remove and rewire knob and tube, direct removal and re feed of outlets and switches utilizing knob and tube. Supply 6 new circuits. Walls are up, rewiring is poOrleans Parish—
Jul 20, 2026—rebuild damaged meter pan stem, as the stem collapsed. and repair/replace meter pan if neccessary, will request same day inspection/reconnect upon completion. WOrleans Parish—
May 7, 2026—Wire hotel space to contractor and plan specifications. Install 400 amp meter pan and main panel, and supply 8 feeders to sub panels in each room.Orleans Parish—
Apr 13, 2026—Rewire open walls to plan/contractor specifications including exterior 200 amp main pass through panel, 200 amp interior sub panel on second floor in laundry roOrleans Parish—
Mar 20, 2026—Rewire bedroom, bathroom, and rear porch to plan specifications, supply 2 bathroom circuits for heat vent and gfi. using existing circuit for bedroom.Orleans Parish—
Dec 23, 2025—Perform 6 month vacancy on apt. This is a reference to a permit that was made in the wrong address (ref#L11LMD) Exceeding the scope of the permit or failure to Orleans Parish—
Dec 18, 2025—Wire addition to plan specifications. Install 60 amp sub panel and provide 4 circuits. Bathroom, bedroom, office, ac blower.Orleans Parish—
Nov 4, 2025—Renovate kitchen. Layout new outlet locations, add under cabinet lighting, new stove circuit Exceeding the scope of the permit or failure to obtain the proper bOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued19
  • Not stated11
  • Finaled8
  • C/o issued6
  • Void1
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.