Contractor · Plumbing
4 STAR SERVICES
46 building permits since 2013 in Hollywood city, FL and Tamarac city, FL — $141,081 in reported job value over 46 permits that state one.
- Building permits
- 46
- Reported job value
- $141.1K
- Active
- 2013–2020
- Latest permit
- Mar 3, 2020
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Hollywood city, FL45
- Tamarac city, FL1
Permits by year
By issue date (application date where there is none).
01020
19
2014201620182020
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 4 |
| 2014 | 7 |
| 2015 | 19 |
| 2016 | 3 |
| 2017 | 3 |
| 2018 | 4 |
| 2019 | 4 |
| 2020 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing46
- Water heaters3
- Kitchens2
- Grading & excavation1
- Bathrooms1
Permit types
As the building departments classify them.
- BACKFLOW PREVENTER - ANNUAL BACKFLOW RECERT5
- BACKFLOW PREVENTER4
- BACKFLOW PREVENTER - ANNUAL BACKFLOW4
- BACKFLOW PREVENTER - annual backflow recertification2
- BACKFLOW PREVENTER - BCK FLW2
- BACKFLOW PREVENTER - BACKFLOW PREVENTER1
- BACKFLOW PREVENTER - CERTIFIED BACKFLOW1
- BACKFLOW PREVENTER - INSTALL 1 1/2 BACKFLOW1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 3, 2020 | PLUMBING WORK - REPAIR AND OR REPLACE UNDER SLAB KITCHEN DRAIN LINE WITH PVC SCH 40 PIPE | REPAIR AND OR REPLACE UNDER SLAB KITCHEN DRAIN LINE WITH PVC SCH 40 PIPE | Hollywood City | $3,650 |
| Mar 2, 2020 | PLUMBING WORK - REPLACE UNDER CAST IRON PIPING WITH SCH 40 PIPE , INSTALL NEW SEWER PIPING | REPLACE UNDER CAST IRON PIPING WITH SCH 40 PIPE , INSTALL NEW SEWER PIPING | Hollywood City | $13,500 |
| Nov 18, 2019 | PLUMBING WORK - EXCAVATION / TUNNEL / REDIRECT KITCHEN AND LAUNDRY DRAIN LINE - RUN NEW DRAIN | EXCAVATION / TUNNEL / REDIRECT KITCHEN AND LAUNDRY DRAIN LINE - RUN NEW DRAIN | Hollywood City | $11,560 |
| Nov 7, 2019 | PLUMBING WORK | — | Hollywood City | $4,980 |
| Oct 30, 2019 | PLBG, REPLACE PB FIXTURES | — | Tamarac City | $1,500 |
| Jan 3, 2019 | PLUMBING WORK - INSTALLING 2 WATER SERVICES FROM EXISTING METER ADD 2ND METER | INSTALLING 2 WATER SERVICES FROM EXISTING METER ADD 2ND METER | Hollywood City | $4,000 |
| Apr 4, 2018 | PLUMBING WORK - REPLACEMENT OF BUILDING DRAIN AND SEWER | REPLACEMENT OF BUILDING DRAIN AND SEWER | Hollywood City | $19,200 |
| Mar 1, 2018 | PLUMBING WORK - E-PERMIT REROUTED LAVATORY DRAIN | E-PERMIT REROUTED LAVATORY DRAIN | Hollywood City | $950 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.