Contractor · Electrical

Manda Lata

47 building permits since 2024 in Peoria city, AZ and Mesa city, AZ — $334,147 in reported job value over 21 permits that state one.

Building permits
47
Reported job value
$334.1K
Active
2024–2026
Latest permit
Oct 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Peoria city, AZ26
  • Mesa city, AZ21

Permits by year

By issue date (application date where there is none).

0510
9
202420252026*
* 2026 is year to date.
View as table
YearPermits
20245
20259
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar26
  • Electrical21
  • Battery storage19
  • Electric meters16
  • EV chargers3

Permit types

As the building departments classify them.

  • Electrical21
  • Commercial19
  • Residential7

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 21, 2026ElectricalINSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR HARDWIRED TESLA VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAMesa$500
Sep 9, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UMesa$15,000
Aug 18, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$16,519
Feb 13, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIOMesa$20,000
Jan 20, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY, EXPANSION PACK, AND NSTALLATION OF A NEW 240 VOLT 50 AMP DEDICATED CIRCUIT BREAKER FOR EV CHARGMesa$20,000
Jan 8, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIOMesa$20,000
Jan 6, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$10,000
Dec 2, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND TWO TESLA POWERWALL 3 EXPANSION PACKS. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S Mesa$20,000

Permit status

Where its permits stand, as the departments report them.

  • Issued21
  • C/o issued20
  • Finaled5
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.