Contractor · Electrical
Manda Lata
47 building permits since 2024 in Peoria city, AZ and Mesa city, AZ — $334,147 in reported job value over 21 permits that state one.
- Building permits
- 47
- Reported job value
- $334.1K
- Active
- 2024–2026
- Latest permit
- Oct 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Peoria city, AZ26
- Mesa city, AZ21
Permits by year
By issue date (application date where there is none).
0510
9
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 5 |
| 2025 | 9 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar26
- Electrical21
- Battery storage19
- Electric meters16
- EV chargers3
Permit types
As the building departments classify them.
- Electrical21
- Commercial19
- Residential7
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2026 | Electrical | INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR HARDWIRED TESLA VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICA | Mesa | $500 |
| Sep 9, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE U | Mesa | $15,000 |
| Aug 18, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $16,519 |
| Feb 13, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIO | Mesa | $20,000 |
| Jan 20, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY, EXPANSION PACK, AND NSTALLATION OF A NEW 240 VOLT 50 AMP DEDICATED CIRCUIT BREAKER FOR EV CHARG | Mesa | $20,000 |
| Jan 8, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIO | Mesa | $20,000 |
| Jan 6, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED | Mesa | $10,000 |
| Dec 2, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND TWO TESLA POWERWALL 3 EXPANSION PACKS. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S | Mesa | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued21
- C/o issued20
- Finaled5
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.