Contractor · HVAC

Jim Laskowski

47 building permits since 2019 in Millbury town, MA; Walpole town, MA and Bolton town, MA, across 5 counties — $719,114 in reported job value over 46 permits that state one.

Building permits
47
Reported job value
$719.1K
Active
2019–2022
Latest permit
Oct 7, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Millbury town, MA9
  • Walpole town, MA6
  • Bolton town, MA4
  • Rutland town, MA4
  • Lexington town, MA3
  • Needham town, MA3
  • Grafton town, MA3
  • North Andover town, MA2
  • Salem city, MA2
  • Milton town, MA2

Permits by year

By issue date (application date where there is none).

012.525
23
2019202020212022
View as table
YearPermits
20192
202021
202123
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC25
  • Heat pumps21
  • Solar14
  • Electrical10
  • Remodels4
  • Battery storage3
  • New construction2
  • Pools & hot tubs2
  • Grading & excavation1
  • Additions1

Permit types

As the building departments classify them.

  • Building Permit - One or Two Family Dwelling9
  • Electrical Permit7
  • Building Permit4
  • Mechanical/Sheet Metal Permit3
  • Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)2
  • Building Permit - Residential (Single, 2-Family or Townhouses) Projects2
  • Mechanical2
  • Mechanical/Sheet Metal Permit-Commercial2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 7, 2022Building Permit—Southborough Town—
Sep 14, 2021Building Permit - Residential (Single, 2-Family or Townhouses) ProjectsInstallation of roof mounted PV Solar System consisting of 20 modules @ 400 watts and 20 AC micro inverters, 100 to 200 amp service upgrade.Needham Town$29,050
Sep 7, 2021Electrical PermitOtherBolton Town$29,803
Sep 2, 2021Electrical Permit - Residential & Commercial ProjectsInstallation of roof mounted PV Solar System consisting of 20 modules @ 400 watts and AC micro inverters. 100 amp to 200 amp service upgrade included.Needham Town$7,255
Aug 31, 2021Building Permit-All One and Two FamilyInstallation of PV Solar System consisting of 44 modules @ 395watts and 44 AC micro invertersWalpole Town$68,249
Aug 26, 2021Electrical Permit RESIDENTIAL One and Two FamilyInstallation of PV Solar System consisting of 44 modules @ 385 watts and 44 AC micro invertersWalpole Town$16,250
Jul 26, 2021Building Permit - One or Two Family DwellingSolar Installation with Structural Upgrading per Engineer Letter (No Battery Storage System)Millbury Town$33,467
Jul 21, 2021Mechanical Permit—Southborough Town$20,877

Permit status

Where its permits stand, as the departments report them.

  • Completed33
  • Active9
  • Issued2
  • Stop work ordered2
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.