Contractor · Specialty (solar, fire, telecom)

SUNRUN

9,187 building permits since 2007 in Los Angeles city, CA; San Diego County, CA and Elk Grove city, CA, across 26 counties — $61,563,753 in reported job value over 3,967 permits that state one.

Building permits
9,187
Reported job value
$61.6M
Active
2007–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA2.1K
  • San Diego County, CA1.6K
  • Elk Grove city, CA1.4K
  • Merced city, CA1K
  • Davis city, CA489
  • San Jose city, CA307
  • Santa Cruz city, CA303
  • Tuolumne County, CA216
  • Riverside city, CA214
  • Anaheim city, CA207

Permits by year

By issue date (application date where there is none).

02K4K
3.2K
200720142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20071
20127
201310
201452
2015116
2016165
2017282
2018491
2019668
2020131
2021343
20221,071
20233,177
2024619
20251,041
2026 (YTD)989

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar6.7K
  • Electrical3.3K
  • Battery storage1.1K
  • Roofing836
  • Plumbing716
  • HVAC715
  • Additions158
  • Remodels148
  • EV chargers135
  • Windows & doors49

Permit types

As the building departments classify them.

  • Electrical2.4K
  • ONLINE SOLAR PHOTOVOLTAIC PERMITS1.4K
  • PHOTOVOLTAIC SYSTEMS771
  • PHOTOVALTIC RESIDENTIAL416
  • PV & ES Systems230
  • Residential200
  • 1 & 2 Family Residential196
  • B-BSP Solar143

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Additions & Alterations - SolarAPPROOF MOUNTED SOLAR, 24 MODULES, 9.84 KW DC WITH 2 ENERGY STORAGE SYSTEMS. PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION - DO NOT COVER MECHANICMerced City$56,068
Oct 22, 2026Additions & Alterations - SolarAPPROOF MOUNTED SOLAR, 8.2 KW DC, 20 MODULES WITH ENERGY STORAGE SYSTEM: (1) L2-ESS-20KWH LUNAR ENERGY, (4) BATTERY MODULE (LFP) LE-DC-UNIT (499LB FOR TOTAL ASSEMBMerced City$30,000
Oct 22, 2026Additions & Alterations - SolarAPPPV SOLAR ROOF MOUNT 4.74 KW DC,12 MODULES,1 ESS. PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION - DO NOT COVER MECHANICAL OR PLUMBING VENTS WITHMerced City$22,000
Oct 21, 2026ElectricalWUI-13.5kWh ESS INSTALLATIONSanta Cruz City—
Oct 21, 2026SolarApp+ PV & ES Systems6.3 KW (14) Panel Roof mount PV System (1) ESSSanta Cruz City—
Oct 20, 2026Additions & Alterations - SolarAPPROOF MOUNTED SOLAR, 11.455KW DC, 29 MODULES WITH 2 ENERGY STORAGE SYSTEM AND 125 AMP SUB PANEL. PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION -Merced City$49,000
Oct 16, 2026PVR6.75KW,(15)PANELS PV SOLAR INSTALL WITH (1)ESS, NEW 225A BACKUP LOADS PANEL TO BE INSTALLED.Contra Costa County$19,825
Oct 16, 2026PVR4.4KW,(10)PANELS PV SOLAR INSTALL WITH (1)ESS.Contra Costa County$25,307

Permit status

Where its permits stand, as the departments report them.

  • Not stated2.6K
  • Issued2.3K
  • Closed1.3K
  • Active1.1K
  • Completed822
  • Finaled494
  • Expired413
  • Withdrawn67

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.