Contractor · Plumbing
Cassidy Plumbing
47 building permits since 2004 in Southeast town, NY; White Plains city, NY and Eastchester town, NY, across 2 counties — $278,400 in reported job value over 26 permits that state one.
- Building permits
- 47
- Reported job value
- $278.4K
- Active
- 2004–2025
- Latest permit
- Jun 18, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Southeast town, NY18
- White Plains city, NY13
- Eastchester town, NY7
- Yorktown town, NY4
- Mount Kisco village, NY3
- New Rochelle city, NY1
- Peekskill city, NY1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2004 | 1 |
| 2005 | 2 |
| 2006 | 2 |
| 2008 | 2 |
| 2009 | 1 |
| 2011 | 2 |
| 2012 | 4 |
| 2013 | 2 |
| 2014 | 1 |
| 2016 | 2 |
| 2017 | 1 |
| 2018 | 5 |
| 2019 | 5 |
| 2020 | 3 |
| 2021 | 3 |
| 2022 | 7 |
| 2024 | 2 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing32
- Gas28
- HVAC17
- Bathrooms9
- Water heaters8
- Kitchens7
- New construction5
- Generators2
- Electrical2
- Remodels1
Permit types
As the building departments classify them.
- PLUMBING11
- PLUMB7
- GAS5
- HVAC4
- RES - BOILER4
- COM - ADD/ALT3
- RES - PLBG3
- COM - PLBG2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 18, 2025 | PLUMB | GAS TEST AND BLUE CARD. | Eastchester Town | — |
| Mar 7, 2025 | PLUMB | NEW GAS LINE FOR FIREPLACE INSERT. | Eastchester Town | — |
| Sep 11, 2024 | PLUMB | REPIPE THE GAS SYSTEM FROM METER TO STOVE, FURNACE AND WATER HEATING. REPLACE FIXTURES IN KITCHEN AND BATH ON FIRST FLOOR. | Eastchester Town | — |
| May 28, 2024 | PLUMB | 3G - ROUGH PLUMBING FOR TWO 3 FIXTURE BATHROOMS AND FINISH WORK. | Eastchester Town | — |
| Nov 15, 2022 | MECHANICAL | SUPPLY AND INSTALL A NAVIEN NCB-250 LP GAS CONDENSING COMBI BOILER | Yorktown Town | — |
| Sep 21, 2022 | PLUMBING | MOVE KITCHEN SINK WASTE LINE + KITCHEN SINK, WATER LINE FOR FRIDGE. RUN GAS LINE TO NEW STOVE LOCATION, REMOVE BASEBOARD BETWEEN BETWEEN DINING RM + KITCHEN + R | Yorktown Town | — |
| Jun 30, 2022 | GAS | Natural Gas Piping to New Boiler | Southeast Town | — |
| Jun 30, 2022 | HVAC | Convert to Gas Boiler | Southeast Town | $11,800 |
Permit status
Where its permits stand, as the departments report them.
- Closed20
- Completed14
- Active7
- Expired4
- Withdrawn1
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.