Contractor · Specialty (solar, fire, telecom)
VANGUARD SOLAR SERVICES LLC
48 building permits since 2022 in Broomfield County, CO; Boulder city, CO and Adams County, CO, across 3 counties — $788,156 in reported job value over 19 permits that state one.
- Building permits
- 48
- Reported job value
- $788.2K
- Active
- 2022–2026
- Latest permit
- Sep 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Broomfield County, CO29
- Boulder city, CO14
- Adams County, CO3
- Boulder County, CO2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 6 |
| 2023 | 1 |
| 2024 | 9 |
| 2025 | 17 |
| 2026 (YTD) | 15 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar47
- Electrical16
- Roofing12
- Battery storage1
- Electric meters1
Permit types
As the building departments classify them.
- B-Add/Alt Solar PV Remove/Replace25
- Electrical Permit14
- B-Add/Alt Solar Panel/Comm3
- B-Add/Alt Solar Panel/Res1
- Building Permit - Plan Review Required1
- Commercial Solar1
- Commercial Solar Other1
- Residential Roof Mounted Solar Electrical System1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 15, 2026 | B-Add/Alt Solar PV Remove/Replace | Solar Removal and Replacement | Broomfield County | — |
| Aug 28, 2026 | Residential Roof Mounted Solar Electrical System | Solar PV System - Additional 8.28 kW Flush Mount, Grid Tied w/Battery Backup (Existing 2.99 PV System Relocated to Detached Garage) | Boulder County | $35,686 |
| Aug 17, 2026 | Electrical Permit | **REVISION 8/31/26-Array layout change. Installation of a 57.60kw DC/ 50kw AC roof ballast mount solar pv system. | Boulder | $115,200 |
| Jun 9, 2026 | Electrical Permit | Detach & Reset roof top solar pv system to allow for a new roof install reinstalled per PMT2008-04622-ELE Linked to RFG2026-00559 | Boulder | $2,700 |
| Jun 8, 2026 | Electrical Permit | **VOID-WORK TO BE INCLUDED IN REROOF-WITH SOLAR PERMIT** Detach & Reset roof top solar pv system to allow for a new roof install | Boulder | $1,200 |
| Jun 1, 2026 | B-Add/Alt Solar PV Remove/Replace | Solar Removal and Replacement | Broomfield County | — |
| May 14, 2026 | Building Permit - Plan Review Required | Commercial Electrical Meter Consolidation | Adams County | $5,000 |
| Apr 24, 2026 | Electrical Permit | Detach & Reset roof top solar pv system to allow for a new roof install Reinstall per PMT2016-00977 Roofing permit RFG2026-00351 | Boulder | $1,100 |
Permit status
Where its permits stand, as the departments report them.
- Not stated29
- Completed10
- Issued5
- Void3
- Closed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.