Contractor · Electrical

Joseph Spirelli

48 building permits since 2024 in Cortlandt town, NY; Mount Pleasant town, NY and Ridgefield town, CT, across 3 counties — $33,546 in reported job value over 11 permits that state one.

Building permits
48
Reported job value
$33.5K
Active
2024–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Cortlandt town, NY27
  • Mount Pleasant town, NY9
  • Ridgefield town, CT6
  • East Fishkill town, NY2
  • Brookfield town, CT1
  • New Fairfield town, CT1
  • Yorktown town, NY1
  • New Rochelle city, NY1

Permits by year

By issue date (application date where there is none).

01530
29
202420252026*
* 2026 is year to date.
View as table
YearPermits
20247
202529
2026 (YTD)12

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical47
  • EV chargers23
  • Windows & doors5
  • Remodels4
  • Electric meters3
  • HVAC2
  • Bathrooms2
  • Demolition2
  • Gas1
  • Kitchens1

Permit types

As the building departments classify them.

  • Electrical Application27
  • Electrical Permit16
  • Building Permit Application2
  • ELECTRICAL1
  • Electrical Permit Application1
  • Electrical Renovations or Alterations1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026Electrical Renovations or Alterations- Supply and install one new 240v 90-amp feeder to re-fed the existing garage with a new panel and rewire the existing circuits. - Supply and install a new 240vNew Rochelle City$4,949
Oct 16, 2026ELECTRICAL- Supply and install all necessary labor and material for one new service upgrade from the existing 100-amps to new 200-amps. SWISYorktown Town—
Sep 23, 2026Electrical Permit- Install one new customer supplied hardwired EV charger on the exterior with a new 240v circuit up to 60-amps.Mount Pleasant Town—
Sep 10, 2026Electrical Application- Install one new customer supplied hardwired EV charger in the garage adjacent to the electrical panel (within 10') with a new 240v circuit up to 60-amps.Cortlandt Town—
Aug 20, 2026Electrical PermitSupply and install 1 new 120v 20-amp GFCI protected circuit and connection to a customer supplied septic pump controller and make all connections in the controlMount Pleasant Town—
Aug 17, 2026Electrical Permit- Supply and install one new 120v 15-amp AFCI (required by code) circuit and receptacle in MC cable next toes fireplace on the exterior wall.Mount Pleasant Town—
Jul 23, 2026Electrical Application- Supply and install all necessary labor and material for one new service upgrade from the existing 100-amps to new 200-amps. - Remove and replace 14 receptacleCortlandt Town—
May 5, 2026Electrical Application-Locate exising undergroung "4 conduits, intercept at demising wal and extend to above ceiling. -Furnish and install new pullbox. - Furnish and install (2) setsCortlandt Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed34
  • Active13
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.