Contractor · Electrical
Joseph Spirelli
48 building permits since 2024 in Cortlandt town, NY; Mount Pleasant town, NY and Ridgefield town, CT, across 3 counties — $33,546 in reported job value over 11 permits that state one.
- Building permits
- 48
- Reported job value
- $33.5K
- Active
- 2024–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cortlandt town, NY27
- Mount Pleasant town, NY9
- Ridgefield town, CT6
- East Fishkill town, NY2
- Brookfield town, CT1
- New Fairfield town, CT1
- Yorktown town, NY1
- New Rochelle city, NY1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 7 |
| 2025 | 29 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical47
- EV chargers23
- Windows & doors5
- Remodels4
- Electric meters3
- HVAC2
- Bathrooms2
- Demolition2
- Gas1
- Kitchens1
Permit types
As the building departments classify them.
- Electrical Application27
- Electrical Permit16
- Building Permit Application2
- ELECTRICAL1
- Electrical Permit Application1
- Electrical Renovations or Alterations1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Electrical Renovations or Alterations | - Supply and install one new 240v 90-amp feeder to re-fed the existing garage with a new panel and rewire the existing circuits. - Supply and install a new 240v | New Rochelle City | $4,949 |
| Oct 16, 2026 | ELECTRICAL | - Supply and install all necessary labor and material for one new service upgrade from the existing 100-amps to new 200-amps. SWIS | Yorktown Town | — |
| Sep 23, 2026 | Electrical Permit | - Install one new customer supplied hardwired EV charger on the exterior with a new 240v circuit up to 60-amps. | Mount Pleasant Town | — |
| Sep 10, 2026 | Electrical Application | - Install one new customer supplied hardwired EV charger in the garage adjacent to the electrical panel (within 10') with a new 240v circuit up to 60-amps. | Cortlandt Town | — |
| Aug 20, 2026 | Electrical Permit | Supply and install 1 new 120v 20-amp GFCI protected circuit and connection to a customer supplied septic pump controller and make all connections in the control | Mount Pleasant Town | — |
| Aug 17, 2026 | Electrical Permit | - Supply and install one new 120v 15-amp AFCI (required by code) circuit and receptacle in MC cable next toes fireplace on the exterior wall. | Mount Pleasant Town | — |
| Jul 23, 2026 | Electrical Application | - Supply and install all necessary labor and material for one new service upgrade from the existing 100-amps to new 200-amps. - Remove and replace 14 receptacle | Cortlandt Town | — |
| May 5, 2026 | Electrical Application | -Locate exising undergroung "4 conduits, intercept at demising wal and extend to above ceiling. -Furnish and install new pullbox. - Furnish and install (2) sets | Cortlandt Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed34
- Active13
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.