Contractor · Electrical
CHARLES M JOSEPH
48 building permits since 2002 in Greenwich town, CT; Ridgefield town, CT and Stamford town, CT, across 3 counties — $961,096 in reported job value over 22 permits that state one.
- Building permits
- 48
- Reported job value
- $961.1K
- Active
- 2002–2026
- Latest permit
- May 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT41
- Ridgefield town, CT3
- Stamford town, CT2
- Glastonbury town, CT1
- Trumbull town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2002 | 1 |
| 2003 | 1 |
| 2013 | 1 |
| 2014 | 1 |
| 2016 | 1 |
| 2021 | 3 |
| 2022 | 15 |
| 2023 | 8 |
| 2024 | 5 |
| 2025 | 8 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical45
- Electric meters12
- Generators8
- Gas5
- Remodels5
- New construction5
- HVAC4
- Bathrooms4
- Plumbing4
- Pools & hot tubs3
Permit types
As the building departments classify them.
- ELE24
- EL29
- GEN8
- Electrical Permit4
- Building Permit1
- Electrical Permit General1
- Residential Electrical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 29, 2026 | ELE | furnish and install all required devices, wiring, fixtures and labor associated materials to provide a fully functional electrical system for a single-family re | Greenwich Town | — |
| Feb 5, 2026 | ELE | (2) additional 30 amp., 240 volt circuits from Unit A and Unit B power panels to the rooftop patio for future hot tub (spa) installation. | Greenwich Town | — |
| Jan 22, 2026 | GEN | Install elec. wiring for a 45 KW 120/240 volt single phase generator and automatic transfer swtch (ATS). 1 Generator and 2 ATS's. Existing 400 amp. service. One | Greenwich Town | $23,000 |
| Jan 16, 2026 | GEN | replace existing 150 amp. generator with a new Generac 150 amp. (32 KW), 120/240 volt, single-phase generator. The existing automatic transfer swtchs., (ATS) to | Greenwich Town | $30,234 |
| Dec 30, 2025 | ELE | Install all electrical components needed for a complete electrical system in a new single-family house as stated, ensuring compliance with Local State and Feder | Greenwich Town | — |
| Oct 17, 2025 | EL2 | install 100 amp. 120/240 v single-phase overhead temporary electrical service with (4) 20 amp. 120 volt circuits for (4) exterior rated GFCI outlets in WP boxes | Greenwich Town | $1,700 |
| Oct 7, 2025 | ELE | Install 400 amp. pedestal service and u.g conduits for the main electrical service, main data/com. Installation of a complete residential house electrical syste | Greenwich Town | — |
| May 30, 2025 | GEN | back-up power generator (26 KW - 120/240 volt, 1 phase) , ATS with load shedding and all associated wiring. Existing 400 amp. service One existing meter. ATS wi | Greenwich Town | $13,644 |
Permit status
Where its permits stand, as the departments report them.
- Completed37
- Active10
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.