Contractor · General building

Andrew Ortiz

48 building permits since 2025 in Branford town, CT; Stamford town, CT and Redding town, CT, across 4 counties — $735,071 in reported job value over 42 permits that state one.

Building permits
48
Reported job value
$735.1K
Active
2025–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Branford town, CT15
  • Stamford town, CT10
  • Redding town, CT9
  • New Canaan town, CT5
  • Stratford town, CT4
  • Darien town, CT3
  • Bristol town, CT2

Permits by year

By issue date (application date where there is none).

02550
41
20252026*
* 2026 is year to date.
View as table
YearPermits
20257
2026 (YTD)41

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms17
  • Electrical16
  • Windows & doors16
  • Remodels11
  • Plumbing10
  • Kitchens8
  • Generators6
  • HVAC5
  • Additions4
  • Electric meters2

Permit types

As the building departments classify them.

  • Residential Building Permit14
  • Electrical Permit12
  • Building Permit6
  • Plumbing Permit6
  • Electrical (& Portable Generators)4
  • Plumbing3
  • Interior Alterations2
  • Building Permit Application1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026Residential Building PermitRemove and replace (2) 2-lite slider windowsBranford Town$1,500
Oct 27, 2026Residential Building PermitRemove 2 existing patio doors and install 2 new vinylmax patio doors.Branford Town$7,120
Oct 26, 2026Electrical PermitElectrical work for addition project, to include: Removal of discontinued wiring. Installation of new circuits and breakers, all light locations, switches, outlStamford Town$7,000
Oct 22, 2026Electrical PermitRelocating (5) switches, (l) outlet and (l) security motion sensor. Installation of new circuits and breakers as needed for New light locations, switches & outlStamford Town$3,650
Oct 19, 2026Plumbing PermitPlumbing work for addition project, to include:Connect to existing drains, supplies and venting, as needed, for: Bedroom Three/Laundry room addition: (l) washinStamford Town$1,000
Oct 15, 2026Electrical PermitElectrical work for master bathroom and hallway bathroom, to include: Master Bathroom : Install rough and finish electrical work to include: Removal of discontiDarien Town—
Oct 15, 2026Plumbing PermitPlumbing work for master bathroom & hallway bathroom remodels, to include: Master bathroom : (1 ) toilet- New location (double Shut-off for Bidet Seat) (2) vaniDarien Town—
Oct 14, 2026Building PermitComplete remodel of Hallway bathroom & Master bathroom, to include the replacement of all fixtures in existing locations; flooring and sheetrock replacement.Darien Town$29,652

Permit status

Where its permits stand, as the departments report them.

  • Active38
  • Completed10

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.