49 building permits since 2021 in Stamford town, CT; Darien town, CT and Stratford town, CT, across 2 counties — $13,758,260 in reported job value over 42 permits that state one.
- Building permits
- 49
- Reported job value
- $13.8M
- Active
- 2021–2025
- Latest permit
- Nov 25, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT41
- Darien town, CT7
- Stratford town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 12 |
| 2022 | 16 |
| 2023 | 12 |
| 2024 | 5 |
| 2025 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC47
- Electrical9
- Demolition7
- Plumbing6
- Gas4
- Bathrooms2
- Heat pumps2
- Roofing1
- Electric meters1
Permit types
As the building departments classify them.
- Mechanical Permit39
- HVAC Permit7
- Building Permit2
- Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 25, 2025 | Mechanical Permit | Remove and Replace (1) existing AHU unit, disconnect and reconnect all piping and controls, electrical disconnect and reconnect by others. | Stamford Town | $98,146 |
| Aug 22, 2025 | Mechanical Permit | Furnish and install VAVs throughout the existing ductwork in the school. Provide new DDC controls and balancing. | Stamford Town | $644,214 |
| Aug 14, 2025 | HVAC Permit | Furnish and install new ductwork and RGDs off existing AC units. | Darien Town | — |
| Apr 28, 2025 | Mechanical Permit | Furnish and install (1) chiller and condenser for the rink ice, (1) dehumidifcation system, (!) DOAS system for exhuast and ventialtion, and (1) RTU for cooling | Stamford Town | $1,160,000 |
| Dec 3, 2024 | HVAC Permit | furnish and install a radiant system off the existing boiler plant | Darien Town | — |
| Jun 21, 2024 | Building Permit | Replace a existing DOAS and Chiller, provide new gas piping, steel dunnage, electrical line voltage, pumps, phydronic piping, and DDC controls. | Stamford Town | $1,092,000 |
| Jun 21, 2024 | Mechanical Permit | Replace the existing chiller, provide new controls, pumps, and insulate anll new piping as needed.Replace the existing Gym DOAS unit and provide new ductwork, s | Stamford Town | $1,092,513 |
| Jan 31, 2024 | HVAC Permit | Relocate existing branch runs, Add (2) new Mitsubishi splits, balancing, insulation | Darien Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed44
- Active4
- Stop work ordered1