Contractor · Electrical

LANCO ELECTRIC LLC

49 building permits since 2021 in Eugene city, OR; Lane County, OR and Marion County, OR, across 3 counties.

Building permits
49
Reported job value
—
Active
2021–2026
Latest permit
Oct 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Eugene city, OR35
  • Lane County, OR4
  • Marion County, OR3
  • Creswell city, OR3
  • Salem city, OR2
  • Benton County, OR1
  • Alpine CDP, OR1

Permits by year

By issue date (application date where there is none).

07.515
12
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20213
202211
20237
202412
202511
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical49
  • Electric meters11
  • Remodels3
  • Accessory dwelling units2
  • Additions2
  • New construction2
  • HVAC1
  • Kitchens1
  • Bathrooms1
  • Generators1

Permit types

As the building departments classify them.

  • Electrical35
  • Residential Electrical14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 8, 2026ElectricalRepair service from theft redo grounding and bonding.Eugene—
Jul 27, 2026ElectricalRemove and replace old meter main zinsco and extend mast higher for better clearance over polycarbonEugene—
Jun 15, 2026Residential Electrical45706 N. Gate Creek 200amp service and sub feed to new manufactured home & feeder to shedLane County—
Apr 1, 2026Residential ElectricalReplace old meter and panel with new meter main with distribution.Lane County—
Feb 17, 2026Residential ElectricalClardy Shop 100 amp feeder from main service to new shop and RV storage building. General lighting and receptacles.Lane County—
Dec 18, 2025ElectricalElectrical for roughly 800 square foot ADU. 100 amp feeder to sub panel in ADU.Eugene—
Aug 18, 2025Residential Electrical1372 Clearwater Replacement of electrical panel, new sub panel on shed, and generator inlet and interlock.Lane County—
Aug 12, 2025Electrical2 branch circuits for already installed split units.Eugene—

Permit status

Where its permits stand, as the departments report them.

  • Issued37
  • Finaled11
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

LANCO ELECTRIC LLC — Building Permits & Contractor Profile | Buildstats