Contractor · Electrical

Kevin M Nolan

49 building permits since 2013 in Orleans Parish, LA.

Building permits
49
Reported job value
—
Active
2013–2024
Latest permit
Sep 3, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA49

Permits by year

By issue date (application date where there is none).

048
8
20142017201920222024
View as table
YearPermits
20136
20143
20168
20177
20188
20194
20205
20223
20232
20243

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical33
  • Electric meters10
  • Remodels7
  • HVAC5
  • Kitchens3
  • Additions3
  • Demolition3
  • Bathrooms2
  • Pools & hot tubs2
  • Heat pumps1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 3, 2024—Remove old knob and tube wiring and ungrounded circuits. Add new 200 amp exterior panel. Check wiring that original electrical contractor installed since he wasOrleans Parish—
Aug 29, 2024—Vacancy permit for the above address. Meter has been off over six months. Front light needs to be replaced and rear GFCI needs to be changed out.Orleans Parish—
Jun 3, 2024—Repair underground feeder and change three phase service to single phase. We met with the Engineering group with Entergy and have approved changing out the meteOrleans Parish—
Nov 13, 2023—Installation of pool panel for swimming poolOrleans Parish—
Mar 19, 2023—Increase service capacity from three phase 200 amps to three phase 400 amp. We met with Entergy on site and submitted load calculation sheet. Project was approvOrleans Parish—
Nov 16, 2022—Installation of outside sub-panel for pool equipment and installation of branch circuits for pool equipment. Installation of branch circuits for gazebo.Orleans Parish—
Aug 4, 2022—Repair/Replace damaged meter and panel. Add additional circuits to residenceOrleans Parish—
Mar 8, 2022—Replace existing electrical service panelOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued28
  • Not stated11
  • C/o issued6
  • Finaled3
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

Kevin M Nolan — Building Permits & Contractor Profile | Buildstats