Contractor · Electrical
John Cole
49 building permits since 1966 in Ridgefield town, CT; Brookfield town, CT and New Milford town, CT — $159,500 in reported job value over 42 permits that state one.
- Building permits
- 49
- Reported job value
- $159.5K
- Active
- 1966–2026
- Latest permit
- Jul 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Ridgefield town, CT17
- Brookfield town, CT10
- New Milford town, CT10
- Redding town, CT6
- New Fairfield town, CT5
- Stamford town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 1966 | 1 |
| 1970 | 1 |
| 2017 | 1 |
| 2022 | 13 |
| 2023 | 12 |
| 2024 | 6 |
| 2025 | 12 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical44
- HVAC15
- Heat pumps12
- Generators8
- Bathrooms5
- Remodels3
- Electric meters3
- New construction3
- Solar1
- Kitchens1
Permit types
As the building departments classify them.
- Electrical Permit31
- Electrical Permit Application5
- Electrical (& Portable Generators)5
- Mechanical Permit4
- Building Permit3
- Generator1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 14, 2026 | Electrical Permit Application | Emergency repair of a 200 amp mast style service. Riser was bend over during the latest storm | New Fairfield Town | $800 |
| Jun 3, 2026 | Electrical Permit | Upgrade 100-200a overhead service with all new grounding, bonding and surge protection. Also install an interlock for generator inlet. | Brookfield Town | $3,500 |
| May 18, 2026 | Electrical Permit | Upgrade 200A service with new meter and main breaker panel with surge protection. Solar was installed on home late last year so all new grounding and bonding wa | Brookfield Town | $4,000 |
| Dec 22, 2025 | Electrical Permit | Wiring of new construction home with new 200 amps underground service and generator prep. Main service to garage with sub feed to house | New Milford Town | $56,000 |
| Dec 17, 2025 | Electrical Permit | Upgrade from a 200A overhead service to a 400A underground. Install all new service equipment with new grounding | Ridgefield Town | $11,000 |
| Oct 20, 2025 | Electrical Permit | Wiring of new construction home with install of 400A underground service | Ridgefield Town | — |
| Sep 11, 2025 | Electrical Permit | Upgrade service from 100a-200a with all new grounding, bonding and surge protection | Ridgefield Town | $3,200 |
| Sep 4, 2025 | Electrical Permit | Complete kitchen remodel with all new circuits and lighting. Wire new basement bathroom. Upgrading service from 200 amps to 400 amps underground. | Ridgefield Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed29
- Active19
- Stop work ordered1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.