Contractor · Electrical

GOLDEN SOLAR ELECTRIC, LLC

49 building permits since 2014 in Boulder city, CO; Boulder County, CO and Broomfield County, CO, across 3 counties — $1,730,841 in reported job value over 45 permits that state one.

Building permits
49
Reported job value
$1.7M
Active
2014–2026
Latest permit
Oct 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO24
  • Boulder County, CO19
  • Broomfield County, CO4
  • Adams County, CO1
  • Thornton city, CO1

Permits by year

By issue date (application date where there is none).

07.515
11
201420172020202220242026*
* 2026 is year to date.
View as table
YearPermits
20142
20161
20171
20191
20204
20212
20227
20234
202411
20257
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar43
  • Electrical43
  • Battery storage18
  • Roofing3
  • Generators1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical Permit23
  • Residential Roof Mounted Solar Electrical System10
  • Electrical Battery Backup7
  • B-Add/Alt Solar Panel/Res2
  • B-Add/Alt Misc Electrical1
  • B-Add/Alt Solar PV Remove/Replace1
  • Building Permit - Plan Review Required1
  • Electrical PV Solar1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 20, 2026Electrical Permit15.88kW BIPV SystemBoulder$45,000
Sep 8, 2026Electrical PermitSpruce Townhomes - 37.84kW Roof mounted PV System (Building 5)Boulder$59,000
Jul 27, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 13.2 kW Flush Mount, Grid TiedBoulder County$55,000
Jun 10, 2026Electrical Battery BackupInstall Battery Backup System (Existing PV BP-25-2134)Boulder County$23,000
Apr 29, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 12.32 kW Flush Mount, Grid Tied w/ Battery BackupBoulder County$59,000
Apr 2, 2026Electrical Permit**REVISION 7/29/26- One line revised to show 150-amp breaker. Label/placard page added. Install a 15.4kW roof mounted solar array. With Tesla powerwall 3 batterBoulder$70,000
Mar 12, 2026Electrical Permit**Revision 7/6/26 - Increase the solar array system size to meet the HERS report. New system size of 11.88k** **REVISION 5/11/26-Panel layout change. Install a Boulder$21,000
Feb 10, 2026Electrical Battery BackupInstall Battery BackupBoulder County$10,000

Permit status

Where its permits stand, as the departments report them.

  • Completed36
  • Issued4
  • Not stated4
  • Reviews in progress2
  • Void1
  • Closed1
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.