Contractor · Electrical

benjamin m carroll

49 building permits since 2024 in Stoughton town, MA; Falmouth town, MA and Bridgewater Town city, MA, across 7 counties — $1,350,404 in reported job value over 35 permits that state one.

Building permits
49
Reported job value
$1.4M
Active
2024–2026
Latest permit
May 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stoughton town, MA15
  • Falmouth town, MA8
  • Bridgewater Town city, MA8
  • Randolph Town city, MA4
  • Milton town, MA3
  • Hanson town, MA3
  • Fairhaven town, MA2
  • 2501519370, MA2
  • Worcester city, MA2
  • West Bridgewater town, MA1

Permits by year

By issue date (application date where there is none).

02040
33
202420252026*
* 2026 is year to date.
View as table
YearPermits
202410
202533
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar43
  • Battery storage42
  • Electrical3
  • HVAC1
  • Heat pumps1

Permit types

As the building departments classify them.

  • RESI.26
  • BUILD15
  • ELECT.3
  • REP1
  • SHT MTL1
  • SOL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 6, 2026RESI.15.910 KW, Rooftop Mounted, Solar PV System (37 panels) No BatteryBridgewater Town City$70,322
Apr 8, 2026SHT MTLductless/minisplit. six zone system with two outdoor units.Milton Town$37,000
Feb 17, 2026BUILD5.590 KW, ROOFTOP MOUNTED, SOLAR PV SYSTEM (13 PANELS) NO BATTERYStoughton Town$26,441
Feb 6, 2026RESI.ROOF MOUNTED SOLAR PV SYSTEM 6.880 KW, 16 PANELS, NO BATTERYBridgewater Town City$26,970
Jan 12, 2026RESI.11.610 kw, rooftop mounted, solar pv system (27 panels) no battery installationFalmouth Town—
Jan 8, 2026ELECT.11.610 kw, rooftop mounted, solar pv system (27 panels) no batteryFalmouth Town—
Dec 19, 2025RESI.16.770 kw, rooftop mounted, solar pv system (39 panels) no battery installation.Falmouth Town—
Dec 17, 2025RESI.16.770 kw, rooftop mounted, solar pv system (39 panels) no battery installation.Falmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Issued22
  • Completed12
  • Closed10
  • Finaled1
  • Cancelled1
  • Withdrawn1
  • Pending payment1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.