Contractor · Electrical

SUNRISE ENERGY GROUP INC

50 building permits since 2015 in Los Angeles city, CA; Norwalk city, CA and Riverside County, CA, across 7 counties — $59,000 in reported job value over 3 permits that state one.

Building permits
50
Reported job value
$59K
Active
2015–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA36
  • Norwalk city, CA5
  • Riverside County, CA1
  • Garden Grove city, CA1
  • Jurupa Valley city, CA1
  • La Habra city, CA1
  • Oakland city, CA1
  • Pittsburg city, CA1
  • Riverside city, CA1
  • Santa Barbara city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
201520172019202120232026*
* 2026 is year to date.
View as table
YearPermits
20153
20165
20172
20183
20199
20208
20214
20221
20231
20251
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical45
  • Solar18
  • Roofing5
  • HVAC4
  • Battery storage4
  • Kitchens1
  • Remodels1
  • Additions1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Electrical41
  • Bldg-Alter/Repair1
  • Electrical Residential solar panel1
  • HVAC1
  • Miscellaneous1
  • Residential1
  • Residential Electrical1
  • Solar Panel1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026MiscellaneousMiscellaneousGarden Grove City$1,000
Mar 31, 2026ElectricalMARILYN SCOTTPittsburg City—
Mar 11, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Feb 10, 2026ElectricalInstall 46 roof-mounted pv solar modules 1 tesla powerwall 3 (1707000-xx-y) inverter(s)(240) 1 tesla powerwall 3 1 tesla tesla backup switchRiverside County—
Feb 10, 2026ResidentialINSTALL PV SOLAR SYSTEM WITH (19) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 8.170 KW (1) ENERGY STORAGE SYSTEMSRiverside City$48,000
Feb 6, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Feb 2, 2026ElectricalRemove and reinstall existing solar system due to a re roofing job. (were only doing the solar part not the roofing part)La Habra City—
Feb 2, 2026ElectricalRemove existing solar and relay solar after reroofJurupa Valley City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated33
  • Finaled6
  • Completed5
  • Active3
  • Issued2
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.