Contractor · Electrical

JCOR GROUP INCORPORATED

50 building permits since 2015 in Los Angeles city, CA.

Building permits
50
Reported job value
—
Active
2015–2023
Latest permit
Feb 2, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA50

Permits by year

By issue date (application date where there is none).

012.525
23
20152017201920212023
View as table
YearPermits
20155
201623
20174
20182
20194
20202
20215
20223
20232

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical50
  • Solar11
  • Battery storage2
  • Roofing2

Permit types

As the building departments classify them.

  • Electrical50

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 2, 2023ElectricalNew Roof Mounted 8.8 kW, PV solar system with 22 panels, 7.6 KW inverLos Angeles City—
Jan 23, 2023ElectricalE-plan. Submitting a combined set of plans for PV Solar system and batLos Angeles City—
Aug 25, 2022Electrical[Eplan] New roofotop mounted PV1 installation with a system size of 10Los Angeles City—
Aug 23, 2022ElectricalEplan New 11.2 kW dc /7.6KW AC rooftop solar system with (28) moduleLos Angeles City—
May 19, 2022ElectricalE-plan. Install a new 9.6 kW rooftop PV1 solar system with 24 modulesLos Angeles City—
Nov 9, 2021Electrical(E-PLAN) NEW PV1 ROOF-MOUNTED INSTALLATION. SCOPE OF WORK INCLUDES 19Los Angeles City—
Oct 6, 2021ElectricalEPLAN. INSTALLAING 4 ESS (TESLA POWERWALL BATTERIES), 1 GENERATION PANLos Angeles City—
Jun 24, 2021Electrical[ePlan] Install 15.5 kW solar PV system flush-mount on homeowner's rooLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.