Contractor · Plumbing

Gopher Sewer and Drain

50 building permits since 2024 in Minneapolis city, MN; Columbia Heights city, MN and Blaine city, MN, across 2 counties.

Building permits
50
Reported job value
—
Active
2024–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN38
  • Columbia Heights city, MN8
  • Blaine city, MN4

Permits by year

By issue date (application date where there is none).

01530
29
202420252026*
* 2026 is year to date.
View as table
YearPermits
20244
202517
2026 (YTD)29

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing47
  • Water heaters12
  • Gas8
  • Kitchens3
  • Bathrooms3
  • Grading & excavation2
  • Remodels1
  • Electrical1

Permit types

As the building departments classify them.

  • Plumbing38
  • Sewer line connection, repair, or service cut7
  • BLDG - Residential4
  • Residential Plumbing Alteration, Remodel, Repair1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026Sewer line connection, repair, or service cut• Install an epoxy liner from the interior mainline stack Y clean-out within 2 feet of the city main (Up to 86 ft)Columbia Heights City—
Oct 26, 2026BLDG - ResidentialRefund - Pulled in Error / Utilities Permit PulledBlaine City—
Oct 26, 2026BLDG - ResidentialUtilities - Epoxy Sewer LinerBlaine City—
Oct 22, 2026Plumbingreplace 6-7 ft of existing kitchen drain lineMinneapolis City—
Oct 9, 2026PlumbingRemove the old galvanized piping and replace it with new PEX piping. Replace the hot and cold water supply lines from the water heater throughout the entire houMinneapolis City—
Sep 25, 2026Sewer line connection, repair, or service cutInstall 57ft of liner from front cleanout. Last joint at 39ft will also be covered.Columbia Heights City—
Sep 24, 2026PlumbingNo plumbing exists currently will add all waste, vent, and all hot and cold supplies for 3/4 bathroom ( toilet, lavatory, and tile shower pan set up ) All wasteMinneapolis City—
Sep 14, 2026BLDG - ResidentialEmergency Repair - Broken Kitchen ValveBlaine City—

Permit status

Where its permits stand, as the departments report them.

  • Closed24
  • Issued18
  • Completed5
  • Expired2
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.