Contractor · General building
Alex Pi
50 building permits since 2021 in Bellevue city, WA; Everett city, WA and Snohomish County, WA, across 3 counties — $4,384,294 in reported job value over 31 permits that state one.
- Building permits
- 50
- Reported job value
- $4.4M
- Active
- 2021–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bellevue city, WA29
- Everett city, WA11
- Snohomish County, WA6
- Tacoma city, WA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2023 | 4 |
| 2024 | 6 |
| 2025 | 10 |
| 2026 (YTD) | 22 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels14
- Additions10
- Bathrooms3
- Accessory dwelling units2
- New construction2
- HVAC1
- Grading & excavation1
- Roofing1
- Plumbing1
- Demolition1
Permit types
As the building departments classify them.
- BU14
- BR10
- RESIDENTIAL BUILDING8
- RBP6
- Building3
- BO2
- BY2
- COMMERCIAL BUILDING2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | BR | #467 LOMBARD DEVS CARPORT TO GARAGE AND INTERIOR R | Bellevue City | — |
| Oct 8, 2026 | Building | EXISTING BUILDING REPAIR AFTER FIRE. ROOF STRUCTURAL REPAIR. PARTIAL WALL REPAIR. DRYWALL, INSULATION, AND FINISH REPAIR. PORCH CONSTRUCTION IN PLACE OF EXISTIN | Tacoma City | $160,000 |
| Oct 7, 2026 | Building | House repair after Fire : The proposed work includes the replacement of the existing heating and cooling equipment. The replacement will be like-for-like, with | Tacoma City | $75,000 |
| Oct 4, 2026 | COMMERCIAL BUILDING | CONVERT (2) PRIVATE GARAGES TO (4) ADDED DWELLING UNITS | Everett City | $260,000 |
| Sep 21, 2026 | RESIDENTIAL BUILDING | EXIST. SFR REBUILD AFTER FIRE; SHED LOCAL REPAIR | Everett City | $475,000 |
| Sep 15, 2026 | Site | Site Development associated with construction of new Single family home BLDRN26-0316 - ***INCLUDES UTILITY CONNECTIONS, DRIVEWAY AND EROSION CONTROL PER APPROVE | Tacoma City | — |
| Sep 1, 2026 | BU | #465 QIUXIA GAO STRUCTURAL INTERIOR REMODEL | Bellevue City | — |
| Aug 27, 2026 | Building | THIS PROJECT IS NEW TWO STORY SFR CONSTRUCTION; 4 BEDROOM; 2.5 BATHROOM | Tacoma City | $343,577 |
Permit status
Where its permits stand, as the departments report them.
- Issued13
- Active11
- Not stated11
- Closed5
- Cancelled3
- Reviews complete3
- Reviews in progress2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.