Contractor · Electrical

jason borges

51 building permits since 2017 in Newport city, RI; Middletown town, RI and Portsmouth town, RI, across 5 counties — $386,200 in reported job value over 50 permits that state one.

Building permits
51
Reported job value
$386.2K
Active
2017–2026
Latest permit
Oct 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Newport city, RI11
  • Middletown town, RI9
  • Portsmouth town, RI5
  • Tiverton town, RI5
  • Providence city, RI5
  • Bristol town, RI3
  • Warwick city, RI2
  • Little Compton town, RI2
  • Johnston town, RI2
  • Warren town, RI1

Permits by year

By issue date (application date where there is none).

07.515
12
20172019202120242026*
* 2026 is year to date.
View as table
YearPermits
20171
20188
20192
20205
20211
20233
20249
202510
2026 (YTD)12

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical51
  • Pools & hot tubs8
  • Kitchens7
  • Bathrooms6
  • Gas4
  • HVAC3
  • Remodels3
  • Additions2
  • Demolition2
  • Electric meters2

Permit types

As the building departments classify them.

  • Electrical Permit50
  • EG Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2026Electrical Permitwire pool, bond and ground inground pool, install subpanel for pool equipmentPortsmouth Town$7,000
Oct 22, 2026Electrical PermitDisconnect existing pool equipment. Perform grounding and bonding of inground pool shell. Wire all pool equipment.Portsmouth Town$6,000
Oct 22, 2026Electrical PermitInstall dedicated outlet for fireplace insertNewport City$500
Oct 21, 2026Electrical PermitProvide electrical panel for pool equipment. Perform bonding and grounding of pool shell. Wire all pool equipment.Middletown Town$7,500
Sep 23, 2026Electrical Permitfinish basement, remodel kitchen, master bed and bathroom, adding sub panelTiverton Town$15,000
Aug 30, 2026Electrical Permitinstall temp pole stanchion for temp powerNewport City$1,500
Aug 11, 2026Electrical Permitinstall electric car chargerPortsmouth Town$1,500
Jul 1, 2026Electrical Permitgut all existing wires and rewire house with newJohnston Town$15,000

Permit status

Where its permits stand, as the departments report them.

  • Completed37
  • Active13
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.