Contractor · Electrical

FREEDOM FOREVER ARIZONA LLC

51 building permits since 2020 in Mesa city, AZ; Peoria city, AZ and Phoenix city, AZ — $504,398 in reported job value over 44 permits that state one.

Building permits
51
Reported job value
$504.4K
Active
2020–2024
Latest permit
Nov 26, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ44
  • Peoria city, AZ6
  • Phoenix city, AZ1

Permits by year

By issue date (application date where there is none).

07.515
15
20202021202220232024
View as table
YearPermits
20204
20217
20222
202315
202411

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical43
  • Solar38
  • Battery storage19
  • Electric meters17
  • Additions1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical43
  • Residential6
  • Additions1
  • SE1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 26, 2024ElectricalTHIS PERMIT IS TO UPGRADE TO A 225A SERVICE WITH 200A BREAKER AND INSTALLATION OF ONE (1) TESLA POWERWALL 3 BATTERY. INSTALLATION SHALL COMPLY WITH CITY OF MESAMesa$14,050
Apr 23, 2024ElectricalRELOCATE (2) ENPHASE IQ BATTERIES. ELD UPDATED TO REFLECT CHANGE. THIS PERMIT DOES NOT INCLUDE THE PV SYSTEM INSTALLATION.Mesa$5,500
Apr 3, 2024ElectricalTHIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A BREAKER. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMMesa$3,500
Mar 28, 2024ElectricalTHIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A BREAKER. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMMesa$3,500
Mar 25, 2024ElectricalTHIS PERMIT IS TO UPGRADE TO A 225A SERVICE WITH 200A BREAKER AND INSTALLATION OF ENPHASE IQ5P BATTERY (NON BACKUP). INSTALLATION SHALL COMPLY WITH CITY OF MESAMesa$6,000
Mar 6, 2024ElectricalTHIS PERMIT IS ONLY FOR THE INSTALLATION OF A TESLA POWER WALL BATTERY AND TESLA POWERWALL BACKUP GATEWAY 2 . ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECMesa$13,500
Feb 27, 2024ElectricalTHIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A BREAKER. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMMesa$22,869
Feb 15, 2024ElectricalTHIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A BREAKER. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMMesa$3,500

Permit status

Where its permits stand, as the departments report them.

  • C/o issued37
  • Expired7
  • Pending payment3
  • Paid2
  • Issued1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.