Contractor · Electrical
EMERALD ISLE ELECTRIC LLC
51 building permits since 2021 in Fort Lauderdale city, FL; Pompano Beach city, FL and Hernando County, FL, across 4 counties — $128,900 in reported job value over 31 permits that state one.
- Building permits
- 51
- Reported job value
- $128.9K
- Active
- 2021–2026
- Latest permit
- Aug 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Fort Lauderdale city, FL16
- Pompano Beach city, FL16
- Hernando County, FL7
- Citrus County, FL6
- Temple Terrace city, FL3
- Hollywood city, FL2
- Tamarac city, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 7 |
| 2022 | 13 |
| 2023 | 16 |
| 2025 | 2 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical42
- Electric meters5
- Generators2
- Plumbing1
- EV chargers1
- Water heaters1
- New construction1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- A~ ELECTRICAL APPLICATION15
- Electrical12
- Revision8
- Residential - Electric5
- ELECTRIC-RES2
- Residential Electrical Express2
- A~ BUILDING APPLICATION NO CO1
- ELECTRICAL SERVICE CHANGE RES,COMMERCIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 4, 2026 | Electrical | Scope of Work: Install one (1) 60-amp, 240-volt hardwired Level 2 EV charger on the exterior wall within approximately 5 feet of the right side of the existing | Citrus County | — |
| Jul 31, 2026 | Self Issuance by Contractor - Electrical Change Out | Installing a new 200amp Meter/Main combo, dual rod grounding system, and surge protector | Hernando County | $12,795 |
| Jul 24, 2026 | General Electric - Residential | Installing a new 200amp Meter/Main combo, dual rod grounding system, and surge protector | Hernando County | $12,795 |
| Jun 17, 2026 | Residential Electrical Express | like-for-like replacement of the existing electrical distribution equipment located inside the garage. | Citrus County | — |
| May 20, 2026 | Electrical | like for like 200 amp main breaker panel replacement * NOC N/A / FLOOD ZONE: AE - BFE: 11.0' - DFE: 12.0' - PRE-FIRM STRUCTURE - ELECTRIC EQUIPMENT SHOULD MEET | Citrus County | — |
| May 19, 2026 | Residential - Electric | installation of a new residential service power pole for a manufactured home | Hernando County | $5,814 |
| May 11, 2026 | Residential - Electric | New circuit and surge 15 - 60 Amp 2 Pole Eaton Br Standard Breaker 18 In Trench Per 10 Ft In Soft Soil Panel Surge Protection (Includes Circuit Breaker) #6 Awg | Hernando County | $3,117 |
| Apr 22, 2026 | Residential - Electric | install new 18 kw generac generator REFUNDED OVERCHARGED ELECTRICAL FEES AND PROPORTIONATE DPR & RADON FEES OF $286.66 ON 5/15/2026 - JAC | Hernando County | $16,183 |
Permit status
Where its permits stand, as the departments report them.
- Closed17
- Void8
- Completed6
- Issued4
- Finaled4
- Reviews in progress3
- Additional information required3
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.