Contractor · Specialty (solar, fire, telecom)
GCB SOLAR INC
534 building permits since 2016 in Marion County, OR; Salem city, OR and Woodburn city, OR, across 11 counties — $26,508,454 in reported job value over 517 permits that state one.
- Building permits
- 534
- Reported job value
- $26.5M
- Active
- 2016–2026
- Latest permit
- Nov 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marion County, OR169
- Salem city, OR47
- Woodburn city, OR37
- Tillamook County, OR28
- Keizer city, OR22
- Sherwood city, OR21
- Clatsop County, OR19
- Columbia County, OR17
- Jefferson city, OR17
- Benton County, OR16
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 3 |
| 2017 | 6 |
| 2018 | 24 |
| 2019 | 36 |
| 2020 | 36 |
| 2021 | 34 |
| 2022 | 92 |
| 2023 | 77 |
| 2024 | 71 |
| 2025 | 83 |
| 2026 (YTD) | 72 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar491
- Electrical297
- Battery storage91
- Remodels9
- Roofing3
- Electric meters3
- EV chargers2
Permit types
As the building departments classify them.
- Residential Structural247
- Residential Electrical221
- Alternate Energy11
- Commercial Structural11
- Alteration - Single Family Dwelling9
- Building7
- Electrical7
- Residential Revision6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 9, 2026 | Residential Electrical | RE ONLY: Installation and hook up of 50.16 kW roof mounted solar system | Woodburn City | $124,228 |
| Nov 9, 2026 | Residential Electrical | Farmdale Solar Project RE ONLY: Installation and hook up of 50.16 kW roof mounted solar system | Marion County | $124,228 |
| Nov 5, 2026 | Commercial Structural | Farmdale Solar Project Installation and hook up of 50.16 kW roof mounted solar system. | Woodburn City | $124,228 |
| Oct 29, 2026 | Residential Structural | Farmdale Multi-Family Housing Installation and hook up of 50.16 kW roof mounted solar system | Woodburn City | $124,228 |
| Aug 21, 2026 | Residential Structural | Solar Panel - Fugate Installation and interconnection of a 10kW solar with optimizers | Sherwood | $28,180 |
| Aug 21, 2026 | Residential Structural | Solar Project Prescriptive | Woodburn City | $32,372 |
| Aug 18, 2026 | Residential Electrical | RE AND 2 200A SERVICES FOR Installation and interconnection of a 5.7kW roof mount solar system with Battery back up. Adding (1) 200A service for the MSP and sec | Woodburn City | $32,372 |
| Aug 18, 2026 | Residential Electrical | Garbarino - Solar Project RE AND 2 200A SERVICES FOR Installation and interconnection of a 5.7kW roof mount solar system with Battery back up. Adding (1) 200A s | Marion County | $32,372 |
Permit status
Where its permits stand, as the departments report them.
- Finaled375
- Issued97
- Withdrawn18
- Expired16
- Closed12
- Additional information required7
- Documents submitted3
- Void2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.