Contractor · Specialty (solar, fire, telecom)
Amaris Jattan
51 building permits since 2017 in Ridgefield town, CT; Stamford town, CT and New Fairfield town, CT, across 3 counties — $1,866,263 in reported job value over 51 permits that state one.
- Building permits
- 51
- Reported job value
- $1.9M
- Active
- 2017–2023
- Latest permit
- Jan 13, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Ridgefield town, CT18
- Stamford town, CT10
- New Fairfield town, CT6
- Redding town, CT6
- Stratford town, CT5
- Brookfield town, CT5
- Glastonbury town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 8 |
| 2018 | 15 |
| 2019 | 12 |
| 2020 | 14 |
| 2022 | 1 |
| 2023 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar50
- Electrical36
- Battery storage6
- Additions3
- Roofing2
- Generators2
- EV chargers1
Permit types
As the building departments classify them.
- Electrical Permit27
- Building Permit6
- Solar Permit Application5
- Solar PV5
- Solar PV Electrical Permit5
- Building Permit Project Application (Residential)1
- Electrical Permit General1
- Electrical (& Portable Generators)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 13, 2023 | Electrical Permit General | Battery storage units tying into existing solar PV roof mounted system - (2) Tesla Powerwall 2.0 battery storage units | Glastonbury Town | $27,850 |
| Nov 30, 2022 | Electrical Permit | Roof mounted solar PV installation - 13.6kW DC - 11.4kW AC - (34) Hanwha Q. Peak Duo Blk ML-G10a+ 400W - (1) Solaredge SE11400H-US inverter - No structural upgr | Ridgefield Town | $43,251 |
| Dec 7, 2020 | Solar PV | Installation of a ground-mounted solar array - 43.74 kW AC - 53.5 kW DC (108) Jinko JKM 405M-72HL-V Modules (5) SMA SB7.7-1SP-US-41 Inverters System includes (3 | Redding Town | $182,395 |
| Nov 2, 2020 | Electrical Permit | Roof mounted solar PV installation - 7.92kW DC 19kW AC - (22) LG360N1C-N5 modules - (1) Generac PWRcell 7.6 inverter - (4) Generac PWRcell Battery units No stru | Ridgefield Town | $41,511 |
| Oct 16, 2020 | Electrical Permit | Rooftop Solar PV installation, including (28) Jinko 320w modules and (1) SolarEdge SE7600H-US inverter. Total DC System Size: 8.96kW. No structural upgrades req | Brookfield Town | $28,338 |
| Aug 13, 2020 | Solar PV | Roof mounted solar PV install - 25.11kW DC - 40.0kW AC - (28)LG355Q1K-V5 modules - (41)LG370Q1C-V5 modules - (2) Solaredge SE10000H-US inverters - (4) Tesla Pow | Redding Town | $124,294 |
| Jul 20, 2020 | Solar PV Electrical Permit | Flush mounted rooftop solar PV system. Installation of (9) Jinko JKM320M-60HBL modules and (9) Enphase M250-60-2LL-S22 Micro Inverters. Total System Size DC: 2. | Stratford Town | $10,350 |
| Jun 3, 2020 | Solar PV | Installation of a ground-mounted solar PV system. 4 SMA Sunnyboy 7.7-US Inverters 1 SMA Sunnyboy 7.0-US Inverter 2 SMA Sunnyboy 5.0-US Inverter 1 SMA Sunnyboy 3 | Redding Town | $199,454 |
Permit status
Where its permits stand, as the departments report them.
- Completed35
- Active15
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.