Contractor · Electrical
Thomas McGowan
52 building permits since 2006 in Warwick city, RI; North Kingstown town, RI and Narragansett town, RI, across 5 counties — $131,600 in reported job value over 35 permits that state one.
- Building permits
- 52
- Reported job value
- $131.6K
- Active
- 2006–2026
- Latest permit
- Aug 17, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Warwick city, RI20
- North Kingstown town, RI7
- Narragansett town, RI6
- Cranston city, RI5
- West Warwick town, RI3
- Barrington town, RI2
- Coventry town, RI2
- Hopkinton town, RI2
- South Kingstown town, RI2
- Canton town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2006 | 1 |
| 2022 | 6 |
| 2023 | 19 |
| 2024 | 11 |
| 2025 | 11 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical51
- Electric meters13
- Bathrooms7
- HVAC3
- Kitchens2
- Pools & hot tubs2
- Telecom1
- Additions1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical Permit46
- 2) Electrical Permit5
- Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 17, 2026 | Electrical Permit | install grounding ring and dedicated 20 amp, 240 volt circuit for above ground pool. | Warwick City | $2,500 |
| Jul 22, 2026 | Electrical Permit | — | Hopkinton Town | — |
| Jul 7, 2026 | Electrical Permit | — | Narragansett Town | — |
| Apr 23, 2026 | Electrical Permit | Upgrade existing 100 amp electrical service to 200 amp electrical service. Replace service entrance conductors, meter socket and main electrical panel. | Warwick City | $3,500 |
| Aug 15, 2025 | Electrical Permit | — | Narragansett Town | — |
| Aug 13, 2025 | Electrical Permit | Secure and support home runs (rough wired by previous electrician) in basement. Terminate home runs into sub panels located in 3rd floor unit, 2nd floor unit an | Providence City | $2,500 |
| Jul 30, 2025 | Electrical Permit | Upgrade existing service to 200 amps. | Warwick City | $3,500 |
| Jun 14, 2025 | Electrical Permit | Install dedicated 20 amp, 120 volt arc fault + ground fault circuits for: basement bathroom receptacle and lighting, basement wet bar countertops, basement dish | Warwick City | $3,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed31
- Active20
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.