Contractor · Specialty (solar, fire, telecom)

SOLEEVA ENERGY INC

52 building permits since 2017 in Mountain View city, CA; Los Altos Hills town, CA and Davis city, CA, across 12 counties — $1,811,810 in reported job value over 37 permits that state one.

Building permits
52
Reported job value
$1.8M
Active
2017–2026
Latest permit
Jul 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mountain View city, CA13
  • Los Altos Hills town, CA5
  • Davis city, CA4
  • Sacramento city, CA4
  • Sacramento County, CA3
  • Elk Grove city, CA3
  • Merced city, CA3
  • San Mateo County, CA2
  • Manteca city, CA2
  • Palo Alto city, CA2

Permits by year

By issue date (application date where there is none).

07.515
14
2017202220242026*
* 2026 is year to date.
View as table
YearPermits
20171
20217
202214
20235
20244
20256
2026 (YTD)14

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar43
  • Electrical16
  • Battery storage10
  • Plumbing7
  • Roofing4
  • Water heaters4
  • HVAC3
  • Accessory dwelling units2
  • Additions1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical12
  • BL, CH, EL10
  • Single Family4
  • ONLINE SOLAR PHOTOVOLTAIC PERMITS3
  • PHOTOVALTIC RESIDENTIAL3
  • PHOTOVOLTAIC SYSTEMS3
  • BUILDING REQUEST2
  • EL2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 20, 2026MISC16.5 KW DC Solar System Installation; 238 233 inspections are required prior to setting panels.Sacramento County$83,085
May 8, 2026RERC108, 131, or 132 inspection required prior to covering any work; Reroofing of approximately 1600 sq.ft of roofSacramento County$10,000
Mar 31, 2026Electrical—Walnut Creek City—
Mar 27, 2026Electrical—Palo Alto City—
Feb 24, 2026ElectricalInstallation of 6.6kw-dc solar system with energy storage system at 13 kwh.Hayward City—
Feb 20, 2026ElectricalSymbium-project_9ae4371d-a9ea-4436-b0e4-507af8c1c6b7:install 9 pv modules (3.96kw) with solaredge technologies ltd. Inverter; install 0 subpanelsSan Mateo County—
Feb 18, 2026ElectricalInstallation of 5.28kw solar system with energy storage systemManteca City—
Feb 11, 2026ElectricalInstallation (2) ess battery storage and gateway outside in the backyard of property and new 200amp sub panel total of 27kwPleasanton City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated23
  • Issued9
  • Active6
  • Finaled6
  • Completed4
  • Closed3
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.