Contractor · General building
MP MINTO ASSOCIATES L P
52 building permits since 2011 in Santa Cruz County, CA.
- Building permits
- 52
- Reported job value
- —
- Active
- 2011–2025
- Latest permit
- Jul 28, 2025
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA52
Permits by year
By issue date (application date where there is none).
01020
19
2011201320232025
View as tableHide table
| Year | Permits |
|---|---|
| 2011 | 19 |
| 2012 | 9 |
| 2013 | 13 |
| 2022 | 3 |
| 2023 | 5 |
| 2024 | 1 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms19
- Solar13
- Roofing13
- Plumbing6
- Water heaters6
- Electrical2
- Gas1
- Grading & excavation1
- Kitchens1
- Electric meters1
Permit types
As the building departments classify them.
- Building52
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 28, 2025 | Building | Replace water heater with associated piping and venting at an existing at an existing structure. Install minimum 1.5”m piping insulation for the first 5 feet of | Santa Cruz County | — |
| Apr 2, 2025 | Building | Replace 75 Gallon water heater with associated piping and venting at an existing at an existing structure unit #200. Install minimum 1.5”m piping insulation for | Santa Cruz County | — |
| May 16, 2024 | Building | Replace like for like 50 gallon water heater with a s s ociated piping and venting at unit 201 . In s tall minimum 1.5" piping in s ulation for the fir s t 5 fe | Santa Cruz County | — |
| Sep 19, 2023 | Building | 6 month extension to issued building permit B-231027 to 4/13/2024 | Santa Cruz County | — |
| Sep 18, 2023 | Building | 6 month extension to issued building permit B-231619 - exp. 4/13/2024 | Santa Cruz County | — |
| May 30, 2023 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Change Order (Construction Change Document) # 1 to buil | Santa Cruz County | — |
| Mar 14, 2023 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install 2 new roof mount (53.706 )kW, (172 ) modules ph | Santa Cruz County | — |
| Mar 14, 2023 | Building | System 1: Total 33kw with 98 modules, include Bldg. 900 kw(11.1) mods(33), Bldg. 700 kw(10.5) mods(31), Bldg. 500 kw(11.6) mods(34), interconnection at 33 Minto | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed51
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.