Contractor · General building

MP MINTO ASSOCIATES L P

52 building permits since 2011 in Santa Cruz County, CA.

Building permits
52
Reported job value
—
Active
2011–2025
Latest permit
Jul 28, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA52

Permits by year

By issue date (application date where there is none).

01020
19
2011201320232025
View as table
YearPermits
201119
20129
201313
20223
20235
20241
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms19
  • Solar13
  • Roofing13
  • Plumbing6
  • Water heaters6
  • Electrical2
  • Gas1
  • Grading & excavation1
  • Kitchens1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building52

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 28, 2025BuildingReplace water heater with associated piping and venting at an existing at an existing structure. Install minimum 1.5”m piping insulation for the first 5 feet ofSanta Cruz County—
Apr 2, 2025BuildingReplace 75 Gallon water heater with associated piping and venting at an existing at an existing structure unit #200. Install minimum 1.5”m piping insulation forSanta Cruz County—
May 16, 2024BuildingReplace like for like 50 gallon water heater with a s s ociated piping and venting at unit 201 . In s tall minimum 1.5" piping in s ulation for the fir s t 5 feSanta Cruz County—
Sep 19, 2023Building6 month extension to issued building permit B-231027 to 4/13/2024Santa Cruz County—
Sep 18, 2023Building6 month extension to issued building permit B-231619 - exp. 4/13/2024Santa Cruz County—
May 30, 2023BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Change Order (Construction Change Document) # 1 to builSanta Cruz County—
Mar 14, 2023BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install 2 new roof mount (53.706 )kW, (172 ) modules phSanta Cruz County—
Mar 14, 2023BuildingSystem 1: Total 33kw with 98 modules, include Bldg. 900 kw(11.1) mods(33), Bldg. 700 kw(10.5) mods(31), Bldg. 500 kw(11.6) mods(34), interconnection at 33 MintoSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed51
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.