Contractor · Electrical
john p duquette
52 building permits since 2015 in Milton town, MA; Foxborough town, MA and Falmouth town, MA, across 6 counties — $5,871,556 in reported job value over 34 permits that state one.
- Building permits
- 52
- Reported job value
- $5.9M
- Active
- 2015–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Milton town, MA9
- Foxborough town, MA7
- Falmouth town, MA6
- Braintree Town city, MA4
- Sandwich town, MA3
- Bridgewater Town city, MA3
- Hanson town, MA3
- Taunton city, MA2
- Littleton town, MA2
- Bellingham town, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2017 | 3 |
| 2018 | 4 |
| 2019 | 9 |
| 2020 | 6 |
| 2021 | 4 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 7 |
| 2025 | 5 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical52
- EV chargers8
- Solar3
- Electric meters3
- HVAC1
- Remodels1
- Additions1
- Bathrooms1
- Generators1
- Fire sprinklers1
Permit types
As the building departments classify them.
- ELECT.41
- Electrical Permit7
- ELECT2
- Electrical Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | — | Install 4 single port chargers 32 amp from an existing 125 amp panel | Somerville City | $42,908 |
| Sep 4, 2026 | ELECT. | — | Concord Town | — |
| Jun 8, 2026 | ELECT. | — | Sandwich Town | — |
| Feb 11, 2026 | ELECT. | Re-locate utility meter socket from inside to outside for the PV Smartmeter-Solar at Walnut Affordable Housing – Building 2 | Foxborough Town | $1,250 |
| Feb 11, 2026 | ELECT. | Re-locate utility meter socket from inside to outside for the PV Smartmeter-Solar at Walnut Affordable Housing – Building 1 | Foxborough Town | $1,250 |
| Feb 9, 2026 | ELECT. | — | Sandwich Town | — |
| Dec 29, 2025 | ELECT. | remodel of existing retail to include, relocation of pos & paint locations electrical/data. | Falmouth Town | — |
| Nov 10, 2025 | ELECT. | Rip & Replace 151 existing fixtures to 143 4' LED Wrap fixture, 3 2x4 LED Flat Panel, & 5 8' LED Strip Fixture in Grace Chapel Church. All work to be done on ex | Foxborough Town | $20,334 |
Permit status
Where its permits stand, as the departments report them.
- Issued20
- Completed12
- Closed7
- Expired4
- Finaled4
- Approved2
- Active1
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.