Contractor · Electrical
GENERATOR POWER SYSTEMS
52 building permits since 2022 in Sugar Land city, TX — $95,460 in reported job value over 3 permits that state one.
- Building permits
- 52
- Reported job value
- $95.5K
- Active
- 2022–2026
- Latest permit
- Jun 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sugar Land city, TX52
Permits by year
By issue date (application date where there is none).
01530
26
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 10 |
| 2023 | 2 |
| 2024 | 11 |
| 2025 | 26 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators48
- Electrical47
- Gas11
- Plumbing7
- Electric meters1
Permit types
As the building departments classify them.
- ELECTRICAL - GENERATOR19
- GENERATOR18
- RESIDENTIAL ELECTRICAL SERVICE9
- PLUMBING - GENERATOR5
- RESIDENTIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 10, 2026 | RESIDENTIAL ELECTRICAL SERVICE | REMOVING FAILED GENERAC GENERATOR AND TRANSFER SWITCH, REPLACING WITH A 26KW KOHLER GENERATOR AND A 200 AMP TRANSFER SWITCH ON AN EXISTING CONCRETE POURED IN PL | Sugar Land | — |
| Mar 30, 2026 | RESIDENTIAL ELECTRICAL SERVICE | REMOVING AND REPLACING FAULTY SERVICE ENTRANCE RATED TRANSFER SWITCH. | Sugar Land | $5,000 |
| Nov 20, 2025 | RESIDENTIAL ELECTRICAL SERVICE | WE WILL BE REPLACING AN OLDER GENERATOR WITH A NEW STANDBY 38KW KOHLER GENERATOR WITH A 200 ATS WE WILL BE STRAPPING 65' NEW ELECTRICAL WIRE | Sugar Land | $32,000 |
| Sep 16, 2025 | ELECTRICAL - GENERATOR | WE WILL BE INSTALLING A 60KW STANDBY KOHLER GENERATOR WITH A 400AMP | Sugar Land | — |
| Sep 16, 2025 | GENERATOR | WE WILL BE INSTALLING A 60KW STANDBY KOHLER GENERATOR WITH A 400AMP | Sugar Land | $58,460 |
| Jun 19, 2025 | RESIDENTIAL ELECTRICAL SERVICE | REPLACE METER CAN | Sugar Land | — |
| May 13, 2025 | PLUMBING - GENERATOR | INSTALL KOHLER 26KW STANDBY POWER GENERATOR W/ 200 AMP ATS SER | Sugar Land | — |
| May 13, 2025 | RESIDENTIAL ELECTRICAL SERVICE | REPLACE CURRENT 150 AMP ATS WITH NEW 150 AMP ATS. NO BREAKER BOX WORK. LIKE FOR LIKE REPLACEMENT | Sugar Land | — |
Permit status
Where its permits stand, as the departments report them.
- Completed40
- Expired11
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.