Contractor · Electrical
Michelle Wallace
53 building permits since 2022 in Boston city, MA; Concord town, MA and Lexington town, MA, across 5 counties — $81,114 in reported job value over 41 permits that state one.
- Building permits
- 53
- Reported job value
- $81.1K
- Active
- 2022–2026
- Latest permit
- Jan 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA20
- Concord town, MA3
- Lexington town, MA3
- Milton town, MA3
- Needham town, MA3
- Haverhill city, MA2
- Ipswich town, MA2
- Salem city, MA2
- Cambridge city, MA2
- Everett city, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 38 |
| 2023 | 8 |
| 2024 | 4 |
| 2025 | 2 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical43
- HVAC16
- Heat pumps14
- Gas3
- Remodels3
- Additions2
- Plumbing2
- Generators2
Permit types
As the building departments classify them.
- ELECTRICAL18
- ELECT.9
- Electrical Permit9
- Electrical3
- Building: Alteration and Addition2
- Gas Permit2
- Building Permit - Residential (Single, 2-Family or Townhouses) Projects1
- *Electrical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 14, 2026 | Electrical Permit | Setup cameras, 360 motion, 2 wireless panics in temp space. Install card acceess, REX, DC, panic and motion in new wireless storage room. Install camera in new | Methuen Town City | $9,000 |
| May 7, 2025 | Electrical Permit | Install new security and CCTV system. | Hanover Town | $19,000 |
| Jan 22, 2025 | Electrical Permit | Tenant specific Design Build, Fire alarm installation. | Wellesley Town | $2,914 |
| Nov 25, 2024 | FIRE ALARM | Will just be replacing panel in same location with same wiring. No other work to be performed. | Ipswich Town | — |
| Oct 4, 2024 | FA | FA | Boston City | $2,900 |
| Feb 22, 2024 | Electrical Permit | Installation of new UL cellular celtral station transmitter, interfaced with existing base building fire alarm central panel. | Beverly City | $2,500 |
| Jan 31, 2024 | ELECT. | — | Concord Town | — |
| Apr 5, 2023 | ELECTRICAL | ELECTRICAL | Boston City | $600 |
Permit status
Where its permits stand, as the departments report them.
- Active28
- Completed12
- Finaled5
- Closed3
- Issued3
- Stop work ordered2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.