Contractor · Electrical
MAC ELECTRIC
53 building permits since 2018 in Old Orchard Beach town, ME; Saco city, ME and Dover city, NH, across 3 counties — $20,000 in reported job value over 5 permits that state one.
- Building permits
- 53
- Reported job value
- $20K
- Active
- 2018–2026
- Latest permit
- Sep 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Old Orchard Beach town, ME30
- Saco city, ME20
- Dover city, NH2
- Exeter town, NH1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 4 |
| 2021 | 8 |
| 2022 | 5 |
| 2023 | 10 |
| 2024 | 8 |
| 2025 | 8 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical51
- Kitchens6
- Remodels6
- Bathrooms4
- Telecom2
- Electric meters2
- New construction2
- Pools & hot tubs2
- HVAC1
Permit types
As the building departments classify them.
- Electrical49
- Building2
- Electrical Wiring2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 14, 2026 | Electrical Wiring | Underground 200a line from meter stack to cell tower | Dover City | $4,000 |
| Jun 12, 2026 | Electrical | Add subpanel | Old Orchard Beach Town | — |
| Jun 9, 2026 | Electrical | Install two light fixtures | Old Orchard Beach Town | — |
| Apr 14, 2026 | Electrical | ELECTRICAL FOR GARAGE REMODEL | Exeter Town | $5,000 |
| Mar 10, 2026 | Electrical | New exhaust hood for commercial kitchen. | Old Orchard Beach Town | — |
| Jan 14, 2026 | Electrical Wiring | Run conduit from pole to transformer then to 600 amp metered disconnect and install all grounding for cell tower | Dover City | $10,000 |
| Dec 3, 2025 | Electrical | Adding fixtures in bathrooms | Saco City | — |
| Nov 3, 2025 | Electrical | W/O#10301226194-Replace existing 100- amp service, overhead service with a 200- amp overhead service. Add a 50- amp 240- volt circuit for a hot tub | Old Orchard Beach Town | — |
Permit status
Where its permits stand, as the departments report them.
- Closed24
- Issued9
- Pending9
- Active8
- Expired1
- Completed1
- C/o issued1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.