Contractor · Electrical
James R Paul Jr
53 building permits since 2012 in Marshfield town, MA; Rockland town, MA and Milton town, MA, across 2 counties — $185,662 in reported job value over 29 permits that state one.
- Building permits
- 53
- Reported job value
- $185.7K
- Active
- 2012–2026
- Latest permit
- Jun 1, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marshfield town, MA30
- Rockland town, MA19
- Milton town, MA2
- Cohasset town, MA1
- Bridgewater Town city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 1 |
| 2014 | 1 |
| 2015 | 1 |
| 2019 | 1 |
| 2020 | 30 |
| 2022 | 5 |
| 2023 | 3 |
| 2024 | 4 |
| 2025 | 4 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical52
- Remodels19
- Kitchens13
- Bathrooms13
- Electric meters6
- HVAC4
- Generators4
- Demolition4
- Heat pumps3
- Additions2
Permit types
As the building departments classify them.
- Electrical Permit30
- ELECT.22
- RESI.1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 1, 2026 | ELECT. | per electrical inspector re: fire call due to sprinkler leak . complete demo of electrical panel and outlets previously disconnected . disassemble 4 lights to i | Rockland Town | $250 |
| May 22, 2026 | RESI. | install pre built 12' x 10' shed | Rockland Town | $8,100 |
| May 21, 2026 | ELECT. | power wiring for 10' x 16' detached shed | Rockland Town | $1,000 |
| Dec 23, 2025 | ELECT. | refeed existing sub panel first floor , renovate 3 rooms on 3rd floor - tenant fit out work to be in conjunction with existing electrical permit | Rockland Town | $6,000 |
| Oct 16, 2025 | ELECT. | inspection to install meter in existing meter socket to energize outdoor service panel located on the exterior of the building . 1 wr gfi and one 20 amp circuit | Rockland Town | $500 |
| Sep 25, 2025 | ELECT. | tenant fit out for 5 units on ground floor . lights , outlets , power | Rockland Town | $9,000 |
| Feb 25, 2025 | ELECT. | wiring for new commercial dish washer , added led lighting in storage and dishwasher area , demo existing wiring in office partitions that were removed . | Rockland Town | $5,000 |
| Jun 6, 2024 | ELECT. | wire mini split hvac system | Rockland Town | $1,000 |
Permit status
Where its permits stand, as the departments report them.
- Active25
- Closed11
- Issued11
- Completed6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.