Contractor · Electrical
Emeli Langi
53 building permits since 2024 in Mesa city, AZ and Peoria city, AZ — $1,308,520 in reported job value over 52 permits that state one.
- Building permits
- 53
- Reported job value
- $1.3M
- Active
- 2024–2026
- Latest permit
- Mar 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ52
- Peoria city, AZ1
Permits by year
By issue date (application date where there is none).
02040
32
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 32 |
| 2025 | 13 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar52
- Electrical50
- Battery storage48
- Electric meters21
Permit types
As the building departments classify them.
- Electrical50
- Residential1
- Single Family (Attached)1
- Single Family (Detached)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 30, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $15,000 |
| Mar 13, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $15,000 |
| Mar 11, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $15,000 |
| Mar 11, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $10,000 |
| Mar 5, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $15,000 |
| Mar 3, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $15,000 |
| Jan 27, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE SIGEN SIGENSTOR BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILI | Mesa | $15,000 |
| Aug 20, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE ENPHASE IQ BATTERY 5P. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY | Mesa | $31,132 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued52
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.