Contractor · Electrical

Emeli Langi

53 building permits since 2024 in Mesa city, AZ and Peoria city, AZ — $1,308,520 in reported job value over 52 permits that state one.

Building permits
53
Reported job value
$1.3M
Active
2024–2026
Latest permit
Mar 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ52
  • Peoria city, AZ1

Permits by year

By issue date (application date where there is none).

02040
32
202420252026*
* 2026 is year to date.
View as table
YearPermits
202432
202513
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar52
  • Electrical50
  • Battery storage48
  • Electric meters21

Permit types

As the building departments classify them.

  • Electrical50
  • Residential1
  • Single Family (Attached)1
  • Single Family (Detached)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 30, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$15,000
Mar 13, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$15,000
Mar 11, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$15,000
Mar 11, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$10,000
Mar 5, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$15,000
Mar 3, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$15,000
Jan 27, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE SIGEN SIGENSTOR BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILIMesa$15,000
Aug 20, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE ENPHASE IQ BATTERY 5P. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITYMesa$31,132

Permit status

Where its permits stand, as the departments report them.

  • C/o issued52
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.