Contractor · General building

Trainque Adam

54 building permits since 2018 in Orleans Parish, LA.

Building permits
54
Reported job value
—
Active
2018–2024
Latest permit
Sep 6, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA54

Permits by year

By issue date (application date where there is none).

07.515
15
2018202020222024
View as table
YearPermits
20186
20198
20206
202115
20226
20237
20246

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels45
  • Electrical16
  • Plumbing14
  • Demolition13
  • HVAC10
  • Windows & doors9
  • Roofing7
  • Bathrooms7
  • Kitchens6
  • New construction3

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)30
  • Renovation (Structural)12
  • Demolition3
  • Accessory Structure2
  • Interior Demolition1
  • New Construction1
  • Swimming Pool1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 6, 2024Renovation (Non-Structural)Front porch refresh: Replace front columns (with wood - will match exactly with existing), change front half round gutter, replaced damaged fascia and soffit onOrleans Parish—
Jun 17, 2024Renovation (Non-Structural)Kitchen renovation. No walls being removed. New cabinets, counters and appliances. For more details, please see attached contract. **Please see last page of theOrleans Parish—
May 28, 2024Renovation (Structural)Building a carport and front patio. More details on plans and in estimate.Orleans Parish—
May 8, 2024Renovation (Non-Structural)see contract for specifics. We are doing interior paint and some electrical and plumbing fixtures are being replaced in bathroom. This is remove and replace. **Orleans Parish—
Mar 4, 2024Swimming PoolThis permit is for a pool renovation only. This includes; new decking, tiles, plaster, automation, and spa. All details can be found in the attached contract. NOrleans Parish—
Feb 6, 2024Accessory StructurePlease note all attachments except the pool acknowledgement are under 23-34581 RNVN. The pool acknowledgement is attached to this application Included in this bOrleans Parish—
Nov 16, 2023—Exploratory Demo to identify what is causing the settlement issues. We will only be removing drywall on the inside. There will be no structural wall removals. OOrleans Parish—
Oct 16, 2023DemolitionDemo the rear shed. See attachments and all application documents for more information.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued30
  • Closed13
  • C/o issued9
  • Void1
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.