Contractor · Electrical
Patrick Lewis
54 building permits since 2017 in Stratford town, CT; Ridgefield town, CT and South Windsor town, CT, across 6 counties — $11,061,089 in reported job value over 43 permits that state one.
- Building permits
- 54
- Reported job value
- $11.1M
- Active
- 2017–2025
- Latest permit
- Oct 21, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stratford town, CT14
- Ridgefield town, CT8
- South Windsor town, CT5
- Darien town, CT5
- Stamford town, CT5
- New Milford town, CT3
- Hamden town, CT2
- Colchester town, CT2
- Norwich town, CT2
- Greenwich town, CT2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 2 |
| 2019 | 3 |
| 2020 | 4 |
| 2021 | 3 |
| 2022 | 5 |
| 2023 | 12 |
| 2024 | 15 |
| 2025 | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical41
- Solar31
- Demolition3
- Electric meters3
- Gas2
- Remodels2
- Roofing2
- Generators2
- EV chargers2
- Pools & hot tubs2
Permit types
As the building departments classify them.
- Electrical Permit32
- Building Permit8
- Photovoltaic Solar Electrical Permit5
- Building2
- *SOLAR2
- EL21
- ELE1
- Electrical Permit General1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2025 | *SOLAR | PHOTOVOLTAIC ROOF MOUNT SYSTEM 242 MODULES - ROOF MOUNTED - 130.68 kWDC, 100.0 kWAC EXISTING GENERATOR: 78.085 kWDC, 67.3 KWAC | Hamden Town | $275,000 |
| Oct 6, 2025 | Electrical Permit General | ROOF MOUNTED PHOTOVOLTAIC SYSTEM 200.00 KW AC / 299.75 KW DC | Glastonbury Town | $218,892 |
| Sep 8, 2025 | Electrical Permit | New Lighting and power to accommodate construction | Stratford Town | $42,645 |
| May 13, 2025 | Electrical Permit | Furnish all labor, material and equipment necessary to complete the electrical work for the Renovation of the existing space Nital Etch | Stratford Town | $177,700 |
| Apr 24, 2025 | Photovoltaic Solar Electrical Permit | Installation of Roof Mounted PV array with four solar edge 50KW inverters. The Solar array will tie into a new electrical service through the NRES buy all progr | South Windsor Town | $647,352 |
| Mar 24, 2025 | Electrical Permit | Directional boring for 5” and 2” Conduits for future MV wiring and comms wiring. Install Equipment pads, Conduit and caps only, No wiring or equipment. This is | Griswold Town | $367,275 |
| Mar 6, 2025 | Electrical Permit | 1. Remove existing electrical conduit for structural work. 2. Replace and re-support damaged electrical conduit. 3. Replace LED soffit light | Stratford Town | $5,015 |
| Mar 6, 2025 | Electrical Permit | 1. Disconnect and remove back to source all electrical devices, conduit, and wire as noted. Retain existing devices, equipment, etc. as shown for reuse. Disposa | Stratford Town | $245,715 |
Permit status
Where its permits stand, as the departments report them.
- Completed35
- Active15
- Approved2
- Stop work ordered2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.