Contractor · Electrical
Bright Home Energy
54 building permits since 2020 in Peoria city, AZ and Mesa city, AZ — $536,228 in reported job value over 23 permits that state one.
- Building permits
- 54
- Reported job value
- $536.2K
- Active
- 2020–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Peoria city, AZ29
- Mesa city, AZ25
Permits by year
By issue date (application date where there is none).
07.515
11
20202023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 11 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar26
- Electrical25
- Battery storage23
- Electric meters21
- Additions1
Permit types
As the building departments classify them.
- Residential29
- Electrical25
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF EIGHT SOLAREDGE NEXIS BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVI | Mesa | $42,189 |
| Sep 29, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTI | Mesa | $22,176 |
| Aug 17, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $13,000 |
| Aug 10, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIO | Mesa | $7,350 |
| Jul 28, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $15,708 |
| May 20, 2026 | Electrical | PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE, THE INSTALLATION OF ONE TESLA POWERWALL 3 AND ONE DC EXPANSION PACK. B.E.S.S. SHALL BE INSTALLED IN ACCORDANC | Mesa | $26,460 |
| Jan 22, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO SOLAR EDGE HOME BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTI | Mesa | $24,108 |
| Jan 20, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UT | Mesa | $22,554 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued22
- Finaled18
- Issued6
- Not stated3
- Pending payment3
- Expired2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.